The Marshall Star for July 17, 2024

The Marshall Star for July 17, 2024

15 Min Read

The Marshall Star for July 17, 2024

The core stage of the Artemis Space Launch System being loaded on a covered barge. The stage is a large cylinder shape with the engines facing toward the camera on two yellow transporters that are guiding the stage into a covered grey container in the background. The body of the cylinder is mostly an orange color and white around the bottom. The four engines on the bottom are covered with red material.

NASA Ships Moon Rocket Stage Ahead of First Crewed Artemis Flight

NASA rolled out the SLS (Space Launch System) rocket’s core stage for the Artemis II test flight from its Michoud Assembly Facility on Tuesday for shipment to the agency’s Kennedy Space Center. The rollout is key progress on the path to NASA’s first crewed mission to the Moon under the Artemis campaign.

Using highly specialized transporters, engineers maneuvered the giant core stage from inside Michoud to NASA’s Pegasus barge. The barge will ferry the stage more than 900 miles to Kennedy, where engineers will prepare it in the Vehicle Assembly Building for attachment to other rocket and Orion spacecraft elements.

The core stage of the Artemis Space Launch System being loaded on a covered barge. The stage is a large cylinder shape with the engines facing toward the camera on two yellow transporters that are guiding the stage into a covered grey container in the background. The body of the cylinder is mostly an orange color and white around the bottom. The four engines on the bottom are covered with red material.
Move teams with NASA and Boeing, the SLS core stage lead contractor, position the massive rocket stage for NASA’s SLS rocket on special transporters to strategically guide the flight hardware the 1.3-mile distance from the factory floor onto the agency’s Pegasus barge on July 16. The core stage will be ferried to NASA’s Kennedy Space Center in Florida, where it will be integrated with other parts of the rocket that will power NASA’s Artemis II mission. Pegasus is maintained at NASA’s Michoud Assembly Facility.
Credit: NASA

“With Artemis, we’ve set our sights on doing something big and incredibly complex that will inspire a new generation, advance our scientific endeavors, and move U.S. competitiveness forward,” said Catherine Koerner, associate administrator for NASA’s Exploration Systems Development Mission Directorate at NASA Headquarters. “The SLS rocket is a key component of our efforts to develop a long-term presence at the Moon.”

Technicians moved the SLS rocket stage from inside Michoud on the 55th anniversary of the launch of Apollo 11 on July 16, 1969. The move of the rocket stage for Artemis marks the first time since the Apollo Program that a fully assembled Moon rocket stage for a crewed mission rolled out from Michoud.

The NASA Michoud Assembly Facility workforce and with other agency team members take a “family photo” with the SLS (Space Launch System) core stage for Artemis II in the background on July 16 at Michoud. The core stage will help launch the first crewed flight of NASA’s SLS rocket for the agency’s Artemis II mission.
The NASA Michoud Assembly Facility workforce and with other agency team members take a “family photo” with the SLS (Space Launch System) core stage for Artemis II in the background on July 16 at Michoud. The core stage will help launch the first crewed flight of NASA’s SLS rocket for the agency’s Artemis II mission.
NASA

The SLS rocket’s core stage is the largest NASA has ever produced. At 212 feet tall, it consists of five major elements, including two huge propellant tanks that collectively hold more than 733,000 gallons of super-chilled liquid propellant to feed four RS-25 engines. During launch and flight, the stage will operate for just over eight minutes, producing more than 2 million pounds of thrust to propel four astronauts inside NASA’s Orion spacecraft toward the Moon.

“The delivery of the SLS core stage for Artemis II to Kennedy Space Center signals a shift from manufacturing to launch readiness as teams continue to make progress on hardware for all major elements for future SLS rockets,” said John Honeycutt, SLS program manager at NASA’s Marshall Space Flight Center. “We are motivated by the success of Artemis I and focused on working toward the first crewed flight under Artemis.”

Team members on July 16 move the first core stage that will help launch the first crewed flight of NASA’s SLS (Space Launch System) rocket for the agency’s Artemis II mission. The move marked the first time a fully assembled Moon rocket stage for a crewed mission has rolled out from NASA’s Michoud Assembly Facility in New Orleans since the Apollo Program.
Team members on July 16 move the first core stage that will help launch the first crewed flight of NASA’s SLS (Space Launch System) rocket for the agency’s Artemis II mission. The move marked the first time a fully assembled Moon rocket stage for a crewed mission has rolled out from NASA’s Michoud Assembly Facility in New Orleans since the Apollo Program.
NASA

After arrival at Kennedy, the stage will undergo additional outfitting inside the Vehicle Assembly Building. Engineers then will join it with the segments that form the rocket’s twin solid rocket boosters. Adapters for the Moon rocket that connect it to the Orion spacecraft will be shipped to Kennedy this fall, where the interim cryogenic propulsion stage is already. Engineers at Kennedy continue to prepare Orion and exploration ground systems for launch and flight.

All major structures for every SLS core stage are fully manufactured at Michoud. Inside the factory, core stages and future exploration upper stages for the next evolution of SLS, called the Block 1B configuration, currently are in various phases of production for Artemis III, IV, and V. Beginning with Artemis III, to better optimize space at Michoud, Boeing – the SLS core stage prime contractor – will use space at Kennedy for final assembly and outfitting activities.

Team members at Michoud Assembly Facility load the first core stage that will help launch the first crewed flight of NASA’s SLS (Space Launch System) rocket for the agency’s Artemis II mission onto the Pegasus barge on July 16. The barge will ferry the core stage on a 900-mile journey from the agency’s Michoud Assembly Facility in New Orleans to its Kennedy Space Center in Florida.
Team members at Michoud Assembly Facility load the first core stage that will help launch the first crewed flight of NASA’s SLS (Space Launch System) rocket for the agency’s Artemis II mission onto the Pegasus barge on July 16. The barge will ferry the core stage on a 900-mile journey from the agency’s Michoud Assembly Facility in New Orleans to its Kennedy Space Center in Florida.
NASA

Building, assembling, and transporting the SLS core stage is a collaborative effort for NASA, Boeing, and lead RS-25 engines contractor Aerojet Rocketdyne, an L3Harris Technologies company. All 10 NASA centers contribute to its development with more than 1,100 companies across the United States contributing to its production. 

NASA is working to land the first woman, first person of color, and its first international partner astronaut on the Moon under Artemis. SLS is part of NASA’s backbone for deep space exploration, along with the Orion spacecraft, supporting ground systems, advanced spacesuits and rovers, the Gateway in orbit around the Moon, and commercial human landing systems. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single launch.

› Back to Top

NASA Barge Preparations for Artemis II Rocket Stage Delivery

Team members installed pedestals aboard NASA’s Pegasus barge to hold and secure the massive core stage of NASA’s SLS (Space Launch System) rocket, preparing NASA barge crews for their first delivery to support the Artemis II test flight around the Moon. The barge ferried the core stage on a 900-mile journey from the agency’s Michoud Assembly Facility to its Kennedy Space Center.

Teams at the agency’s Michoud Assembly Facility in New Orleans are preparing the agency’s Pegasus barge to carry the SLS rocket’s core stage from the agency’s rocket factory to NASA’s Kennedy Space Center in Florida.
Team members at NASA’s Michoud Assembly Facility install pedestals aboard the Pegasus barge to hold and secure the massive core stage of NASA’s SLS (Space Launch System) rocket ahead.
NASA/Eric Bordelon

The Pegasus crew began installing the pedestals July 10. The barge, which previously was used to ferry space shuttle external tanks, was modified and refurbished to compensate for the much larger and heavier core stage for the SLS rocket. Measuring 212 feet in length and 27.6 feet in diameter, the core stage is the largest rocket stage NASA has ever built and the longest item ever shipped by a NASA barge.

Pegasus now measures 310 feet in length and 50 feet in width, with three 200-kilowatt generators on board for power. Tugboats and towing vessels moved the barge and core stage from Michoud to Kennedy, where the core stage will be integrated with other elements of the rocket and prepared for launch. Pegasus is maintained at NASA Michoud.

NASA is working to land the first woman, first person of color, and its first international partner astronaut on the Moon under Artemis. SLS is part of NASA’s backbone for deep space exploration, along with the Orion spacecraft, supporting ground systems, advanced spacesuits and rovers, the Gateway in orbit around the Moon, and commercial human landing systems. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single launch.

NASA’s Marshall Space Flight Center manages the SLS Program and Michoud.

› Back to Top

Michoud Marks Artemis II Milestone with Employee Event Featuring NASA Astronaut Victor Glover

Moon to Mars Program Deputy Associate Administrator Amit Kshatriya, left, and NASA astronaut Victor Glover, right, speak to Michoud Assembly Facility team members on July 15 as part of a Space Flight Awareness event marking Artemis II’s core stage completion. The core stage was rolled out of Michoud’s rocket factory on July 16 for transportation to NASA’s Kennedy Space Center, where it will be integrated with the Orion spacecraft and the remaining components of the SLS (Space Launch System) rocket.

Moon to Mars Program Deputy Associate Administrator Amit Kshatriya, left, and NASA astronaut Victor Glover, right, speak to Michoud Assembly Facility team members on July 15 as part of a Space Flight Awareness event marking Artemis II’s core stage completion. The core stage was rolled out of Michoud’s rocket factory on July 16 for transportation to NASA’s Kennedy Space Center, where it will be integrated with the Orion spacecraft and the remaining components of the SLS (Space Launch System) rocket. (NASA)

› Back to Top

Tawnya Laughinghouse Named Director of Marshall’s Materials and Processes Laboratory

Tawnya Plummer Laughinghouse has been named to the Senior Executive Service position of director of the Materials and Processes Laboratory in the Engineering Directorate at NASA’s Marshall Space Flight Center, effective July 7.

Tawnya Laughinghouse
Tawnya Plummer Laughinghouse has been named to the Senior Executive Service position of director of the Materials and Processes Laboratory in the Engineering Directorate at NASA’s Marshall Space Flight Center.
NASA

The Materials and Processes Laboratory provides science, technology, and engineering support in materials, processes, and products for use in space vehicle applications, including related ground facilities, test articles and support equipment. As director, Laughinghouse will oversee a workforce of science and engineering experts, as well as several research and development efforts in world-class facilities, including the National Center for Advanced Manufacturing.

Laughinghouse has more than 20 years of experience at NASA holding various technical leadership, supervisory, and programmatic positions. Since October 2018, she has been manager of the Technology Demonstration Missions (TDM) Program for the Agency, managing the implementation of a diverse portfolio of advanced space technology projects led by NASA Centers and industry partners across the nation with a goal to rapidly develop, demonstrate, and infuse revolutionary, high-payoff technologies. Under her leadership, the program helped expand the boundaries of the aerospace enterprise with the launch of 10 advanced technologies to space between 2018 and 2024. In January 2017, she was competitively selected as deputy manager of the TDM Level 2 Program Office within Marshall’s Science and Technology Office.

In 2014, she was selected as a member of the NASA Mid-Level Leadership Program. During that time, she completed a detail at NASA Headquarters supporting an Office of Chief Engineer/Office of Chief Technologist joint study on NASA’s Technology Readiness Assessment (TRA) Process.

Laughinghouse began her NASA career at Marshall in 2004 in the Materials and Processes Laboratory as lead materials engineer for the Space Shuttle Reusable Solid Rocket Motor (RSRM) Booster Separation Motor aft closure assembly. In this role, she also provided technical expertise in advanced materials for high temperature applications and thermal protection systems for solid and liquid rocket propulsion systems. Over the next 12 years, she served the lab in various capacities, including technical lead of the Ceramics & Ablatives team from 2010 to 2016, and developmental assignments such as assistant chief of the Space and Environmental Effects Branch, and chief of the Nonmetallic Materials Branch. Prior to joining Marshall, Laughinghouse spent six years in the U.S. manufacturing industry as a process chemist and product engineer.

Laughinghouse has been awarded the NASA Exceptional Achievement Medal, the NASA Exceptional Service Medal, and a host of group achievement and external awards, including the distinguished Merit Award from the National Alumnae Association of Spelman College in 2021. She has been recognized extensively in the community for her advocacy for women in STEM and mentoring.

A federally certified senior/expert program and project manager, Laughinghouse is a graduate of several leadership programs, including the Office of Personnel Management Federal Executive Institute’s Leadership for a Democratic Society. She is a May 2024 graduate of Leadership Greater Huntsville’s Connect-26 Class.

A native of Columbus, Ohio, Laughinghouse was raised in Huntsville and graduated salutatorian of her class at Sparkman High School in Toney, Alabama. After completing a NASA Summer High School Apprenticeship Research Program (SHARP) internship at Marshall, she applied for the NASA Women in Science and Engineering (WISE) dual-degree program and went on to earn a bachelor’s degree in chemistry and a bachelor’s degree in chemical engineering from Spelman College and the Georgia Institute of Technology, respectively. She also holds a Master of Science in management (concentration in management of technology) from the University of Alabama in Huntsville.

› Back to Top

Marshall Engineers Unveil Versatile, Low-cost Hybrid Engine Testbed

By Rick Smith

In June, engineers at NASA’s Marshall Space Flight Center unveiled an innovative, 11-inch hybrid rocket motor testbed.

The new hybrid testbed, which features variable flow capability and a 20-second continuous burn duration, is designed to provide a low-cost, quick-turnaround solution for conducting hot-fire tests of advanced nozzles and other rocket engine hardware, composite materials, and propellants.

A pair of NASA engineers conduct checkout testing of a new hybrid rocket engine testbed, a long, blue, cylindrical facility for testing new government and industry rocket motor hardware, materials, and propellants at NASA’s Marshall Space Flight Center.
Paul Dumbacher, right, lead test engineer for the Propulsion Test Branch at NASA’s Marshall Space Flight Center, confers with Meredith Patterson, solid propulsion systems engineer, as they install the 11-inch hybrid rocket motor testbed into its cradle in Marshall’s East Test Stand.
NASA/Charles Beason

Solid rocket propulsion remains a competitive, reliable technology for various compact and heavy-lift rockets as well as in-space missions, offering low propulsion element mass, high energy density, resilience in extreme environments, and reliable performance.

“It’s time consuming and costly to put a new solid rocket motor through its paces – identifying how materials perform in extreme temperatures and under severe structural and dynamic loads,” said Benjamin Davis, branch chief of the Solid Propulsion and Pyrotechnic Devices Branch of Marshall’s Engineering Directorate. “In today’s fast-paced, competitive environment, we wanted to find a way to condense that schedule. The hybrid testbed offers an exciting, low-cost solution.”

Initiated in 2020, the project stemmed from NASA’s work to develop new composite materials, additively manufactured – or 3D-printed – nozzles, and other components with proven benefits across the spacefaring spectrum, from rockets to planetary landers.

After analyzing future industry requirements, and with feedback from NASA’s aerospace partners, the Marshall team recognized that their existing 24-inch rocket motor testbed – a subscale version of the Space Launch System booster – could prove too costly for small startups. Additionally, conventional, six-inch test motors limited flexible configuration and required multiple tests to achieve all customer goals. The team realized what industry needed most was an efficient, versatile third option.

“The 11-inch hybrid motor testbed offers the instrumentation, configurability, and cost-efficiency our government, industry, and academic partners need,” said Chloe Bower, subscale solid rocket motor manufacturing lead at Marshall. “It can accomplish multiple test objectives simultaneously – including different nozzle configurations, new instrumentation or internal insulation, and various propellants or flight environments.”

Three female NASA engineers conduct post-test analysis of disassembled, cylindrical components of a new, hybrid rocket motor testbed at NASA’s Marshall Space Flight Center.
Assessing components of the 11-inch hybrid rocket motor testbed in the wake of successful testing are, from left, Chloe Bower, Marshall’s subscale solid rocket motor manufacturing lead; Jacobs manufacturing engineer Shelby Westrich; and Precious Mitchell, Marshall’s solid propulsion design lead.
NASA/Benjamin Davis

“That quicker pace can reduce test time from months to weeks or days,” said Precious Mitchell, solid propulsion design lead for the project.

Another feature of great interest is the on/off switch. “That’s one of the big advantages to a hybrid testbed,” Mitchell said. “With a solid propulsion system, once it’s ignited, it will burn until the fuel is spent. But because there’s no oxidizer in hybrid fuel, we can simply turn it off at any point if we see anomalies or need to fine-tune a test element, yielding more accurate test results that precisely meet customer needs.”

The team expects to deliver to NASA leadership final test data later this summer. For now, Davis congratulates the Marshall propulsion designers, analysts, chemists, materials engineers, safety personnel, and test engineers who collaborated on the new testbed.

“We’re not just supporting the aerospace industry in broad terms,” he said. “We’re also giving young NASA engineers a chance to get their hands dirty in a practical test environment solving problems. This work helps educate new generations who will carry on NASA’s mission in the decades to come.”

For nearly 65 years, Marshall teams have led development of the U.S. space program’s most powerful rocket engines and spacecraft, from the Apollo-era Saturn V rocket and the space shuttle to today’s cutting-edge propulsion systems, including NASA’s newest rocket, the Space Launch System. NASA technology testbeds designed and built by Marshall engineers and their partners have shaped the reliable technologies of spaceflight and continue to enable discovery, testing, and certification of advanced rocket engine materials and manufacturing techniques. 

Smith, an Aeyon/MTS employee, supports the Marshall Office of Communications.

› Back to Top

NASA Honors 25 Years of Chandra at July National Space Club Breakfast

NASA Ships Moon Rocket Stage Ahead of First Crewed Artemis Flight https://www.nasa.gov/news-release/nasa-ships-moon-rocket-stage-ahead-of-first-crewed-artemis-flight/ NASA Marshall Engineers Unveil Versatile, Low-cost Hybrid Engine Testbed https://www.nasa.gov/centers-and-facilities/marshall/nasa-marshall-engineers-unveil-versatile-low-cost-hybrid-engine-testbed/ Take a Summer Cosmic Road Trip With NASA’s Chandra and Webb https://www.nasa.gov/image-article/take-a-summer-cosmic-road-trip-with-nasas-chandra-and-webb/ 55 Years Ago: Apollo 11’s One Small Step, One Giant Leap https://www.nasa.gov/history/55-years-ago-apollo-11s-one-small-step-one-giant-leap/ Two Years Since Webb’s First Images: Celebrating with the Penguin and the Egg Andrew Schnell, acting manager of the Chandra X-ray Observatory at NASA’s Marshall Space Flight Center, honored 25 years of the project’s mission success at National Space Club – Huntsville’s breakfast event on July 16.

Andrew Schnell, acting manager of the Chandra X-ray Observatory at NASA’s Marshall Space Flight Center, honored 25 years of the project’s mission success at National Space Club – Huntsville’s breakfast event on July 16.

Schnell provided insight into Chandra’s history – sharing photos and stories from the project’s initial development, launch, first light images, and some of the most iconic images captured by the telescope to date.

Chandra launched on STS-93 Shuttle Columbia July 23, 1999. Originally designed as a five-year mission, the telescope’s prolonged success is a testament to the agency’s engineering capabilities.

“One of the things that excites me about working with Chandra is that are we not only changing our understanding of the universe today, but the data we collect now may help answer questions astrophysicists haven’t even asked yet.” Schnell said. “One day, an astrophysicist – maybe one that hasn’t been born yet – will have a theory, and our data will be there to help them test that theory.” (Photo Credit: Face to Face Marketing)

› Back to Top

Take a Summer Cosmic Road Trip with NASA’s Chandra and Webb

It’s time to take a cosmic road trip using light as the highway and visit four stunning destinations across space. The vehicles for this space get-away are NASA’s Chandra X-ray Observatory and James Webb Space Telescope.

The first stop on this tour is the closest, Rho Ophiuchi, at a distance of about 390 light-years from Earth. Rho Ophiuchi is a cloud complex filled with gas and stars of different sizes and ages. Being one of the closest star-forming regions, Rho Ophiuchi is a great place for astronomers to study stars. In this image, X-rays from Chandra are purple revealing infant stars that violently flare and produce X-rays. Infrared data from Webb are red, yellow, cyan, light blue and darker blue and provide views of the spectacular regions of gas and dust.

Rho Ophiuchi, a cloud complex filled with gas, and dotted with stars. The murky green and gold cloud resembles a ghostly head in profile, swooping down from the upper left, trailing tendrils of hair. Cutting across the bottom edge and lower righthand corner of the image is a long, narrow, brick red cloud which resembles the ember of a stick pulled from a fire. Several large white stars dot the image. Many are surrounded by glowing neon purple rings, and gleam with diffraction spikes.
The first stop on this tour is the closest, Rho Ophiuchi, at a distance of about 390 light-years from Earth.
X-ray: NASA/CXC/MIT/C. Canizares; IR: NASA/ESA/CSA/STScI/K. Pontoppidan; Image Processing: NASA/ESA/STScI/Alyssa Pagan, NASA/CXC/SAO/L. Frattare and J. Major

The next destination is the Orion Nebula. Still located in the Milky Way galaxy, this region is a little bit farther from our home planet at about 1,500 light-years away. If you look just below the middle of the three stars that make up the “belt” in the constellation of Orion, you may be able to see this nebula through a small telescope. With Chandra and Webb, however, we get to see so much more. Chandra reveals young stars that glow brightly in X-rays, colored in red, green, and blue, while Webb shows the gas and dust in darker red that will help build the next generation of stars here.

The Orion Nebula.
X-ray: NASA/CXC/Penn State/E.Fei

It’s time to leave our galaxy and visit another. Like the Milky Way, NGC 3627 is a spiral galaxy that we see at a slight angle. NGC 3627 is known as a “barred” spiral galaxy because of the rectangular shape of its central region. From our vantage point, we can also see two distinct spiral arms that appear as arcs. X-rays from Chandra in purple show evidence for a supermassive black hole in its center while Webb finds the dust, gas, and stars throughout the galaxy in red, green, and blue. This image also contains optical data from the Hubble Space Telescope in red, green, and blue.

The galaxy NGC 3627 appears pitched at an oblique angle, tilted from our upper left down to our lower right. Much of its face is angled toward us, making its spiral arms, composed of red and purple dots, easily identifiable. Several bright white dots ringed with neon purple speckle the galaxy. At the galaxy’s core, where the spiral arms converge, a large white and purple glow identified by Chandra provides evidence of a supermassive black hole.
Spiral galaxy NGC 3627.
X-ray: NASA/CXC/SAO; Optical: NASA/ESO/STScI, ESO/WFI; Infrared: NASA/ESA/CSA/STScI/JWST; Image Processing:/NASA/CXC/SAO/J. Major

Our final landing place on this trip is the farthest and the biggest. MACS J0416 is a galaxy cluster, which are among the largest objects in the Universe held together by gravity. Galaxy clusters like this can contain hundreds or even thousands of individual galaxies all immersed in massive amounts of superheated gas that Chandra can detect. In this view, Chandra’s X-rays in purple show this reservoir of hot gas while Hubble and Webb pick up the individual galaxies in red, green, and blue.

Here is the distant galaxy cluster known as MACS J0416. The blackness of space is packed with glowing dots and tiny shapes, in whites, purples, oranges, golds, and reds, each a distinct galaxy. Upon close inspection (and with a great deal of zooming in!) the spiraling arms of some of the seemingly tiny galaxies are revealed in this highly detailed image. Gently arched across the middle of the frame is a soft band of purple; a reservoir of superheated gas detected by Chandra.
ACS J0416 galaxy cluster.
X-ray: NASA/CXC/SAO/G. Ogrean et al.; Optical/Infrared: (Hubble) NASA/ESA/STScI; IR: (JWST) NASA/ESA/CSA/STScI/Jose M. Diego (IFCA), Jordan C. J. D’Silva (UWA), Anton M. Koekemoer (STScI), Jake Summers (ASU), Rogier Windhorst (ASU), Haojing Yan (University of Missouri)

NASA’s Marshall Space Flight Center manages the Chandra program. The Smithsonian Astrophysical Observatory’s Chandra X-ray Center controls science from Cambridge Massachusetts and flight operations from Burlington, Massachusetts.

› Back to Top

Powered by WPeMatico

Get The Details…
Lee Mohon

NASA Ends VIPER Project, Continues Moon Exploration

NASA Ends VIPER Project, Continues Moon Exploration

NASA's VIPER - short for the Volatiles Investigating Polar Exploration Rover - sits assembled inside the cleanroom at the agency's Johnson Space Center.
NASA’s VIPER – short for the Volatiles Investigating Polar Exploration Rover – sits assembled inside the cleanroom at the agency’s Johnson Space Center.
Credit: NASA

Following a comprehensive internal review, NASA announced Wednesday its intent to discontinue development of its VIPER (Volatiles Investigating Polar Exploration Rover) project.

NASA stated cost increases, delays to the launch date, and the risks of future cost growth as the reasons to stand down on the mission. The rover was originally planned to launch in late 2023, but in 2022, NASA requested a launch delay to late 2024 to provide more time for preflight testing of the Astrobotic lander. Since that time, additional schedule and supply chain delays pushed VIPER’s readiness date to September 2025, and independently its CLPS (Commercial Lunar Payload Services) launch aboard Astrobotic’s Griffin lander also has been delayed to a similar time. Continuation of VIPER would result in an increased cost that threatens cancellation or disruption to other CLPS missions. NASA has notified Congress of the agency’s intent.

“We are committed to studying and exploring the Moon for the benefit of humanity through the CLPS program,” said Nicola Fox, associate administrator, Science Mission Directorate, NASA Headquarters in Washington. “The agency has an array of missions planned to look for ice and other resources on the Moon over the next five years. Our path forward will make maximum use of the technology and work that went into VIPER, while preserving critical funds to support our robust lunar portfolio.”

Moving forward, NASA is planning to disassemble and reuse VIPER’s instruments and components for future Moon missions. Prior to disassembly, NASA will consider expressions of interest from U.S. industry and international partners by Thursday, Aug. 1, for use of the existing VIPER rover system at no cost to the government. Interested parties should contact HQ-CLPS-Payload@mail.nasa.gov after 10 a.m. EDT on Thursday, July 18. The project will conduct an orderly close out through spring 2025.

Astrobotic will continue its Griffin Mission One within its contract with NASA, working toward a launch scheduled for no earlier than fall 2025. The landing without VIPER will provide a flight demonstration of the Griffin lander and its engines.

NASA will pursue alternative methods to accomplish many of VIPER’s goals and verify the presence of ice at the lunar South Pole. A future CLPS delivery – the Polar Resources Ice Mining Experiment-1 (PRIME-1) — scheduled to land at the South Pole during the fourth quarter of 2024, will search for water ice and carry out a resource utilization demonstration using a drill and mass spectrometer to measure the volatile content of subsurface materials.

Additionally, future instruments as part of NASA’s crewed missions – for example, the Lunar Terrain Vehicle — will allow for mobile observations of volatiles across the south polar region, as well as provide access for astronauts to the Moon’s permanently shadowed regions for dedicated sample return campaigns. The agency will also use copies of three of VIPER’s four instruments for future Moon landings on separate flights.

The VIPER rover was designed to search Earth’s Moon for ice and other potential resources – in support of NASA’s commitment to study the Moon and help unravel some of the greatest mysteries of our solar system. Through NASA’s lunar initiatives, including Artemis human missions and CLPS, NASA is exploring more of the Moon than ever before using highly trained astronauts, advanced robotics, U.S. commercial providers, and international partners.

For more information about VIPER, visit:

https://www.nasa.gov/viper

-end-

Karen Fox / Erin Morton
Headquarters, Washington
202-358-1600 / 202-805-9393
karen.c.fox@nasa.gov / erin.morton@nasa.gov

Powered by WPeMatico

Get The Details…
Tiernan P. Doyle

Experience the Launch of NASA’s SpaceX Crew-9 Mission

Experience the Launch of NASA’s SpaceX Crew-9 Mission

Digital content creators are invited to register to attend the launch of the ninth SpaceX Dragon spacecraft and Falcon 9 rocket that will carry astronauts to the International Space Station for a science expedition mission. This mission is part of NASA’s Commercial Crew Program

Launch of NASA’s SpaceX Crew-9 mission is targeted for no earlier than mid-August from Launch Complex 39A at the agency’s Kennedy Space Center in Florida. The launch will carry NASA astronauts Zena Cardman, commander; Nick Hague, pilot; and Stephanie Wilson, mission specialist; along with Roscosmos cosmonaut Alexander Gorbunov, mission specialist. 

If your passion is to communicate and engage the world online, then this is the event for you! Seize the opportunity to see and share the #Crew9 mission launch. 

A maximum of 50 social media users will be selected to attend this two-day event and will be given access similar to news media. 

NASA Social participants will have the opportunity to: 

  • View a crewed launch of the SpaceX Falcon 9 rocket and Dragon spacecraft 
  • Tour NASA facilities at Kennedy Space Center 
  • Meet and interact with Crew-9 subject matter experts 
  • Meet fellow space enthusiasts who are active on social media 

Registration for this event opens on Wednesday, July 17, and the deadline to apply is at 10 a.m. EDT on Monday, July 22. All social applications will be considered on a case-by-case basis.

APPLY NOW 

Do I need to have a social media account to register? 

 Yes. This event is designed for people who: 

  • Actively use multiple social networking platforms and tools to disseminate information to a unique audience. 
  • Regularly produce new content that features multimedia elements. 
  • Have the potential to reach a large number of people using digital platforms, or reach a unique audience, separate and distinctive from traditional news media and/or NASA audiences. 
  • Must have an established history of posting content on social media platforms. 
  • Have previous postings that are highly visible, respected and widely recognized. 

Users on all social networks are encouraged to use the hashtag #NASASocial and #Crew9. Updates and information about the event will be shared on X via @NASASocial and @NASAKennedy, and via posts to Facebook and Instagram

How do I register? 

Registration for this event opens on Wednesday, July 17, and the deadline to apply is at 10 a.m. EDT on Monday, July 22. All social applications will be considered on a case-by-case basis.

Can I register if I am not a U.S. citizen? 

Because of the security deadlines, registration is limited to U.S. citizens. If you have a valid permanent resident card, you will be processed as a U.S. citizen. 

When will I know if I am selected? 

After registrations have been received and processed, an email with confirmation information and additional instructions will be sent to those selected. We expect to send the acceptance notifications by August 7.

What are NASA Social credentials? 

All social applications will be considered on a case-by-case basis. Those chosen must prove through the registration process they meet specific engagement criteria. 

If you do not make the registration list for this NASA Social, you still can attend the launch offsite and participate in the conversation online. Find out about ways to experience a launch here. 

What are the registration requirements? 

Registration indicates your intent to travel to NASA’s Kennedy Space Center in Florida and attend the two-day event in person. You are responsible for your own expenses for travel, accommodations, food, and other amenities. 

Some events and participants scheduled to appear at the event are subject to change without notice. NASA is not responsible for loss or damage incurred as a result of attending. NASA, moreover, is not responsible for loss or damage incurred if the event is cancelled with limited or no notice. Please plan accordingly. 

Kennedy is a government facility. Those who are selected will need to complete an additional registration step to receive clearance to enter the secure areas. 

IMPORTANT: To be admitted, you will need to provide two forms of unexpired government-issued identification; one must be a photo ID and match the name provided on the registration. Those without proper identification cannot be admitted

For a complete list of acceptable forms of ID, please visit: NASA Credentialing Identification Requirements

All registrants must be at least 18 years old. 

What if the launch date changes? 

Many different factors can cause a scheduled launch date to change multiple times. If the launch date changes, NASA may adjust the date of the NASA Social accordingly to coincide with the new target launch date. NASA will notify registrants of any changes by email. 

If the launch is postponed, attendees will be invited to attend a later launch date. NASA cannot accommodate attendees for delays beyond 72 hours. 

NASA Social attendees are responsible for any additional costs they incur related to any launch delay. We strongly encourage participants to make travel arrangements that are refundable and/or flexible. 

What if I cannot come to the Kennedy Space Center? 

If you cannot come to the Kennedy Space Center and attend in person, you should not register for the NASA Social. You can follow the conversation online using #NASASocial.  

You can watch the launch on NASA+ or plus.nasa.gov. NASA will provide regular launch and mission updates on @NASA, @NASAKennedy, and @Commercial_Crew, as well as on NASA’s Commercial Crew Program blog

If you cannot make this NASA Social, don’t worry; NASA is planning many other Socials in the near future at various locations! 

Powered by WPeMatico

Get The Details…
Gary Daines

NASA, SpaceX Invite Media to Watch Crew-9 Launch to Space Station

NASA, SpaceX Invite Media to Watch Crew-9 Launch to Space Station

The crew of NASA’s SpaceX Crew-9 mission to the International Space Station poses for a photo during training in Hawthorne, California.
The crew of NASA’s SpaceX Crew-9 mission to the International Space Station poses for a photo during training in Hawthorne, California.
Credit: SpaceX

Media accreditation now is open for the launch of NASA’s ninth rotational mission of a SpaceX Falcon 9 rocket and Dragon spacecraft that will carry astronauts to the International Space Station for a science expedition. This mission is part of NASA’s Commercial Crew Program.

Launch of NASA’s SpaceX Crew-9 mission is targeted for no earlier than mid-August from Launch Complex 39A at the agency’s Kennedy Space Center in Florida, pending completion of the company’s ongoing Falcon 9 investigation. Crew safety and mission assurance are top priorities for NASA and its partners.

The launch will carry NASA astronauts Zena Cardman, commander; Nick Hague, pilot; and Stephanie Wilson, mission specialist; along with Roscosmos cosmonaut Alexander Gorbunov, mission specialist. This is the first spaceflight for Cardman and Gorbunov, the second mission to the orbiting laboratory for Hague, and fourth spaceflight for Wilson, who has spent 42 days in space aboard three space shuttle Discovery missions – STS-120, STS-121, and STS-131.

U.S. media, international media without U.S. citizenship, and U.S. citizens representing international media organizations must apply by 11:59 p.m. EDT on Wednesday, July 31. All accreditation requests must be submitted online at:

https://media.ksc.nasa.gov

NASA’s media accreditation policy is online. For questions about accreditation or special logistical requests, email: ksc-media-accreditat@mail.nasa.gov. Requests for space for satellite trucks, tents, or electrical connections are due by Thursday, Aug. 1.

For other questions, please contact NASA Kennedy’s newsroom at: 321-867-2468.

Para obtener información sobre cobertura en español en el Centro Espacial Kennedy o si desea solicitar entrevistas en español, comuníquese con Antonia Jaramillo: 321-501-8425, o Messod Bendayan: 256-930-1371.

For launch coverage and more information about the mission, visit:

https://www.nasa.gov/commercialcrew

-end-

Joshua Finch / Claire O’Shea
Headquarters, Washington
202-358-1100
joshua.a.finch@nasa.gov / claire.a.o’shea@nasa.gov

Steve Siceloff / Danielle Sempsrott / Stephanie Plucinsky
Kennedy Space Center, Florida
321-867-2468
steven.p.siceloff@nasa.gov / danielle.c.sempsrott@nasa.gov / stephanie.n.plucinsky@nasa.gov

Leah Cheshier
Johnson Space Center, Houston
281-483-5111
leah.d.cheshier@nasa.gov

Powered by WPeMatico

Get The Details…
Tiernan P. Doyle

The Next Full Moon is the Buck or Thunder Moon

The Next Full Moon is the Buck or Thunder Moon

23 Min Read

The Next Full Moon is the Buck or Thunder Moon

A large deer with spiky antlers stands majes·ti·cal·ly in a forest.
Mule deer buck, Yellowstone National Park

The Next Full Moon is the Buck or Thunder Moon; the Hay or Mead Moon; Guru Purnima; Asalha Puja (aka Dharma Day or Esala Poya); and the start of Vassa. 

The next full Moon will be Sunday morning, July 21, 2024, appearing opposite the Sun (in Earth-based longitude) at 6:17 AM EDT. For the International Date Line West and the American Samoa and Midway time zones this will be late Saturday night. For Line Islands Time this will be early Monday morning. The Moon will appear full for about three days around this time, from Friday evening through Monday morning, making this a full Moon weekend. 

The Maine Farmers’ Almanac began publishing “Indian” names for full Moons in the 1930s and these names are now widely known and used. According to this almanac, as the full Moon in June the Algonquin tribes of what is now the northeastern United States called this the Buck Moon. Early summer is normally when the new antlers of buck deer push out of their foreheads in coatings of velvety fur. They also called this the Thunder Moon because of early Summer’s frequent thunderstorms.

Europeans called this the Hay Moon for the haymaking of early summer, and sometimes the Mead Moon (although this name was also used for the previous full Moon). Mead is created by fermenting honey mixed with water, sometimes adding fruits, spices, grains, or hops. 

For Hindus, Buddhists, and Jains, this is the Guru Full Moon (Guru Purnima), celebrated as a time for clearing the mind and honoring the guru or spiritual master. 

For Theravada Buddhists this full Moon is Asalha Puja, also known as Dharma Day or Esala Poya, an important festival celebrating the Buddha’s first sermon after reaching nirvana, which started Buddhism. This sermon became the core of Buddhist teachings and includes the four noble truths. In addition, with this full Moon the Buddhist Monks start Vassa, the annual three-month retreat during the rainy season. 

In many traditional lunisolar and lunar calendars full Moons fall on or near the middle of the lunar months. This full Moon is near the middle of the sixth month of the Chinese year of the Dragon, Tammuz in the Hebrew calendar, and Muharram in the Islamic calendar. Muharram is one of the four sacred months during which warfare is forbidden. 

Since this is the Thunder Moon, a quick note on lightning safety. Most of the lightning that strikes the ground arcs from the negatively charged bottom of the storm to the ground underneath the storm. Much rarer is positive lightning, which arcs from the top of a thunderstorm to strike much farther away. Positive lightning can sometimes strike areas where the sky is clear (hence the term “bolt out of the blue”). NOAA’s Lightning FAQ Page says that almost all lightning will occur within 10 miles of its parent thunderstorm, but that lightning detection equipment has confirmed bolts striking up to almost 50 miles away. Because positive lightning arcs across a greater distance it tends to be 5 to 10 times more powerful than regular ground strikes. It can strike dry areas outside of the storm’s rainfall, so positive lightning tends to start more fires than negative lightning. Although positive lightning is rare (less than 5% of all lightning strikes), the lack of warning and its greater power make it more lethal. A good rule to follow is, if you can hear the thunder, you can be struck by lightning. As a bicycle enthusiast and daily commuter (before I retired) I am well aware that the inch or so of rubber tire between my metal bicycle and the ground will make little difference to a bolt that can arc across miles of air from the top of a thunderstorm to where I am riding. 

As usual, the wearing of suitably celebratory celestial attire is encouraged in honor of the full Moon. Be safe (especially during thunderstorms), avoid starting wars, and take a moment to clear your mind. 

As for other celestial events between now and the full Moon after next (with specific times and angles based on the location of NASA Headquarters in Washington, D.C.):

As summer continues the daily periods of sunlight continue to shorten from their longest on the summer solstice on June 20, 2024. On Sunday, July 21, (the day of the full Moon), morning twilight will begin at 4:52 AM, sunrise will be at 6:00 AM, solar noon at 1:15 PM when the Sun will reach its maximum altitude of 71.4 degrees, sunset will be at 8:28 PM, and evening twilight will end at 9:37 PM. By Monday, Aug. 21, (the day of the full Moon after next), morning twilight will begin at 5:24 AM, sunrise will be at 6:26 AM, solar noon at 1:11 PM when the Sun will reach its maximum altitude of 63.6 degrees, sunset will be at 7:57 PM, and evening twilight will end at 8:58 PM.

Six meteor showers are predicted to peak during this lunar cycle, including one of the best meteor showers of the year for the Southern Hemisphere and one of the best meteor showers of the year for the Northern Hemisphere. 

On July 31, 2024, the Southern Delta Aquariids (005 SDA) meteor shower is predicted to peak at 25 meteors per hour (under ideal conditions). This shower is one of the most active annual sources for the Southern Hemisphere, but viewing it from our more northern latitudes will be difficult. As reported by the International Meteor Organization, this shower has a broad peak, and in past years observers from Australia (in 1977) and Crete (in 2003) have reported outbursts of 40 meteors per hour several days before the predicted peak. On the morning of the predicted peak (July 31), the best time to look (from the Washington, D.C. area) will likely be from after midnight until about 2 AM. The radiant (the point from which the meteors appear to radiate out from) will rise on the east-southeastern horizon on July 30 at about 10:15 PM. Since half of the meteors are hidden by the horizon at radiant rise, waiting until the radiant is higher in the sky should make more meteors visible. But moonrise will be at 1:58 AM (when the radiant will be about 30 degrees above the south-southeastern horizon). After moonrise moonlight will interfere with seeing these meteors, making our window for seeing these meteors fairly short. The parent body for this meteor shower is not certain, but they are caused by dust entering our atmosphere at 41 kilometers per second (92,000 miles per hour), so fast that air gets compressed and heated until it glows white-hot. 

This should be a good year for the annual Perseid meteor shower. The Perseids (007 PER) meteor shower is predicted to peak on Monday, Aug. 12, 2024, between 9 AM and Noon EDT (when we can’t see them). At its peak (under ideal conditions) the Perseids can produce about 100 visible meteors per hour, making it one of the three best meteor showers of the year for the Northern Hemisphere (the others being the Quadrantids in early January and the Geminids in mid December). The time closest to the predicted peak that we can see will be the early morning of Aug. 12. Moonset will be a little before midnight on Aug. 11, and the radiant will rise higher in the north-northeastern sky until the sky shows the first signs of dawn (before morning twilight begins at 5:16 AM). The peak is broad, and in past years high activity has been reported well after the peak, so keep an eye on the sky between moonset and the first hints of dawn for the nights before and after the predicted peak. The Perseid meteor shower is caused by dust from the comet 109P/Swift-Tuttle entering our atmosphere at 59 kilometers per second (132,000 miles per hour) – as previously noted, so fast that air gets compressed and heated until it glows white-hot. 

The best conditions for viewing these meteors would be if the weather is clear with no clouds or high hazes, you go to a place far from any light sources or urban light pollution, and you have a clear view of a wide expanse of the sky. Be sure to give your eyes plenty of time to adapt to the dark. The rod cells in your eyes are more sensitive to low light levels but play little role in color vision. Your color-sensing cone cells are concentrated near the center of your view with more of the rod cells on the edge of your view. Since some meteors are faint, you will tend to see more meteors from the “corner of your eye” (which is why you need a view of a large part of the sky). Your color vision (cone cells) will adapt to darkness in about 10 minutes, but your more sensitive night vision will continue to improve for an hour or more (with most of the improvement in the first 35 to 45 minutes). The more sensitive your eyes are, the more chance you have of seeing meteors. Even a short exposure to light (from passing car headlights, etc.) will start the adaptation over again (so no turning on a light or your cell phone to check what time it is). 

The other four meteor showers, the July Gamma Draconids (184 GDR), Alpha Capricornids (001 CAP), Eta Eridanids (191 ERI), and Kappa Cygnids (012 KCG), are all expected to produce less than five meteors per hour under ideal conditions (which most of us don’t have in our urban and suburban environs) but if you happen to be out with a clear sky late at night or in the early morning, your odds of spotting a meteor are a little higher than usual. 

No comets are expected to be visible this lunar cycle. 

Evening Sky Highlights

On the evening of Sunday, July 21, 2024 (the evening of the day of the full Moon), as twilight ends (at 9:37 PM EDT), the rising Moon will be 3 degrees above the east-southeastern horizon. The bright planet Mercury will be 1 degree above the west-northwestern horizon and six minutes away from setting. The planet Venus will set 22 minutes before twilight ends, but will be bright enough to see in the glow of dusk, low on the west-northwestern horizon before it sets. The bright object appearing closest to overhead will be Vega, the brightest star in the constellation Lyra the lyre, at 65 degrees above the eastern horizon. Vega is one of the three bright stars in the “Summer Triangle,” along with Deneb and Altair. It is the fifth-brightest star in our night sky, about 25 light-years from Earth, has twice the mass of our Sun, and shines 40 times brighter than our Sun. 

As this lunar cycle progresses the background of stars will appear to shift westward each evening (as the Earth moves around the Sun), while the planet Mercury will initially dwell low on the west-northwestern horizon, shifting towards the left. On July 24 Mercury will be 2 degrees below the bright star Regulus, and this will be the last evening Mercury will be above the horizon as twilight ends (although it may remain visible in the glow of dusk before twilight ends into early August). The bright planet Venus will also be visible in the glow of dusk, gradually shifting away from the Sun, but will not be above the horizon as twilight ends until late August. The bright star Regulus will appear about 1 degree to the lower right of Venus on Aug. 4, low on the west-northwestern horizon, with Regulus setting 17 minutes before evening twilight ends. The waxing Moon will pass by Venus and Regulus on Aug. 5 (setting before evening twilight ends), Spica on Aug. 9 and 10, and Antares on Aug. 13. Aug. 16 will be the first evening that the planet Saturn will be above the eastern horizon as evening twilight ends. 

By the evening of Monday, Aug. 19 (the evening of the day of the full Moon after next), as twilight ends (at 8:58 PM), the rising Moon will be 7 degrees above the east-southeastern horizon. The only visible planet in the sky will be Saturn at 1.5 degrees above the eastern horizon. The planet Venus will set four minutes before twilight ends but will be bright enough to see in the glow of dusk, low on the western horizon before it sets. The bright object appearing closest to overhead will still be Vega at 80 degrees above the eastern horizon. 

Morning Sky Highlights

On the morning of Sunday, July 21, 2024 (the morning of the day of the full Moon), as twilight begins (at 4:52 AM EDT), the setting Moon will be 7 degrees above the southwestern horizon. The brightest planet in the sky will be Jupiter at 25 degrees above the eastern horizon. Mars will be 33 degrees above the eastern horizon and Saturn 45 degrees above the southern horizon. The bright object appearing closest to overhead will be the star Deneb at 56 degrees above the west-northwestern horizon. Deneb is the 19th brightest star in our night sky and is the brightest star in the constellation Cygnus the swan. Deneb is one of the three bright stars of the Summer Triangle (along with Vega and Altair). It is about 20 times more massive than our Sun but has used up its hydrogen, becoming a blue-white supergiant about 200 times the diameter of the Sun. If Deneb were where our Sun is, it would extend to about the orbit of Earth. Deneb is about 2,600 light-years from us. 

As this lunar cycle progresses, Jupiter, Saturn, and the background of stars will appear to shift westward each evening, with Mars shifting more slowly and to the left toward Jupiter. The waning Moon will pass by Saturn on July 25, Mars on July 30, Jupiter on July 31, and Pollux on Aug. 2 and 3. Jupiter and Mars will appear at their closest on Aug. 14, after which they will separate again. 

By the morning of Monday, Aug. 19 (the morning of the day of the full Moon after next), as twilight begins (at 5:24 AM), the setting full Moon will be 5 degrees above the southwestern horizon. The brightest planet in the sky will be Jupiter at 49 degrees above the eastern horizon. Near Jupiter will be Mars at 47 degrees above the eastern horizon. Saturn will be 29 degrees above the southwestern horizon. The bright object appearing closest to overhead will be the star Capella, the brightest star in the constellation Auriga the charioteer, at 55 degrees above the east-northeastern horizon. Although we see Capella as a single star (the sixth-brightest in our night sky), it is actually four stars (two pairs of stars orbiting each other). Capella is about 43 light-years from us.

Detailed Daily Guide

Here for your reference is a day-by-day listing of celestial events between now and the full Moon after next. The times and angles are based on the location of NASA Headquarters in Washington, D.C., and some of these details may differ for where you are (I use parentheses to indicate times specific to the D.C. area). 

Wednesday night into early Thursday morning, July 17 to 18, 2024, the bright star Antares will appear near the waxing gibbous Moon. As evening twilight ends (at 9:40 PM EDT) Antares will be 3 degrees to the upper right of the Moon. The Moon will reach its highest in the sky 27 minutes later (at 10:07 PM). As Antares sets (at 2:21 AM) it will be 5 degrees to the lower right of the Moon. For much of the southern part of Africa the Moon will pass in front of Antares earlier on Wednesday. See http://lunar-occultations.com/iota/bstar/0717zc2366.htm (external link) for a map and information on the locations that will see this occultation. 

As mentioned above, the full Moon will be Sunday morning, July 21, 2024, appearing opposite the Sun (in Earth-based longitude) at 6:17 AM EDT. This will be late Saturday night in the International Date Line West and the American Samoa and Midway time zones, and early Monday morning in the Line Islands Time zone. The Moon will appear full for about three days around this time, from Friday evening through Monday morning, making this a full Moon weekend. 

Early Monday morning, July 22, 2024, will be when the planet Mercury reaches its greatest angular separation from the Sun as seen from Earth for this apparition (called greatest elongation). Because the angle between the line from the Sun to Mercury and the line of the horizon changes with the seasons, the date when Mercury and the Sun appear farthest apart as seen from Earth is not always the same as when Mercury appears highest above the horizon as evening twilight ends (which occurred on July 13). 

Early Wednesday morning, July 24, 2024, at 1:43 AM EDT, the Moon will be at perigee, its closest to Earth for this orbit. 

Wednesday evening, July 24, 2024, will be the last evening that the planet Mercury will be above the west-northwestern horizon as evening twilight ends (at 9:34 PM EDT), setting one minute later. This will also be the evening when Mercury will appear closest to the bright star Regulus, which will be 2 degrees above Mercury on the horizon. 

Wednesday night into Thursday morning, July 24 to 25, 2024, the planet Saturn will appear near the waning gibbous Moon. At moonrise on the eastern horizon (at 10:45 PM EDT) Saturn will be 4 degrees to the upper right of the Moon. By the time the Moon reaches its highest (at 4:42 AM) Saturn will be 7 degrees to the lower right, with morning twilight beginning 14 minutes later. See http://lunar-occultations.com/iota/planets/0724saturn.htm (external link) for a map and information on where the Moon will block Saturn from view. 

Saturday evening July 27, 2024, the waning Moon will appear half-full as it reaches its last quarter at 10:52 PM EDT (when we can’t see it).

Tuesday, July 30, 2024, the planet Mars will appear 4 degrees to the lower right of the waning crescent Moon with the Pleiades star cluster to the upper right of the Moon. Mars will rise on the east-northeastern horizon (at 1:39 AM EDT) with the Pleiades star cluster 5 degrees to the upper right of the Moon. Morning twilight will begin more than three hours later (at 5:01 AM) with the Pleiades 7 degrees to the upper right.

As described earlier in this posting, early Wednesday morning, July 31, 2024, from about midnight until moonrise (at 1:58 AM EDT) will likely be the best time to look toward the southeast for the Southern Delta Aquariids (005 SDA) meteor shower. Although viewing from our more northern latitudes will be limited, this shower is one of the most active annual sources for the Southern Hemisphere (with a predicted peak of 25 meteors per hour under ideal conditions). This shower has a broad peak, and rare outbursts of up to 40 meteors per hour have been reported days before the predicted peak (in 1977 and 2003). You might have an increased chance of seeing meteors in the early mornings from after midnight to before moonrise around this date. 

Friday morning, Aug. 2, 2024, the bright star Pollux (the brighter of the twin stars in the constellation Gemini) will appear 8 degrees to the lower left of the waning crescent Moon. Pollux will rise after the Moon on the northeastern horizon (at 4:24 AM EDT) and morning twilight will begin 41 minutes later (at 5:05 AM). 

The next morning, Saturday, Aug. 3, 2024, the thin, waning crescent Moon will have shifted to 7 degrees below Pollux. The Moon will rise (at 4:59 AM EDT) on the east-northeastern horizon just six minutes before morning twilight begins. 

Throughout this lunar cycle the planet Mars will be passing above the bright star Aldebaran as it moves towards the bright planet Jupiter. Sunday morning, Aug. 4, 2024, will be when Mars and Aldebaran will be at their closest, about 5 degrees apart. Jupiter, Mars, and Aldebaran will form a triangle, with Mars above, Aldebaran to the lower right (matching Mars in brightness), and bright Jupiter to the lower left. Aldebaran will rise last (at 1:53 AM EDT) on the east-northeastern horizon and will be 37 degrees above the eastern horizon as morning twilight begins (at 5:07 AM). The constellation Orion will appear on the horizon below this triangle. 

Sunday morning, Aug. 4, 2024, at 7:13 AM EDT, will be the new Moon, when the Moon passes between the Earth and the Sun and will not be visible from the Earth. The day of, or the day after the New Moon marks the start of the new month for most lunisolar calendars. Aug. 4 is the start of the seventh month of the Chinese Year of the Dragon. Sundown on Aug. 4 is the start of Av in the Hebrew calendar. In the Islamic calendar the months traditionally start with the first sighting of the waxing crescent Moon. Many Muslim communities now follow the Umm al-Qura Calendar of Saudi Arabia, which uses astronomical calculations to start months in a more predictable way. Using this calendar, sundown on Sunday, Aug. 4, will probably mark the start of Safar, the second month of the Islamic calendar. 

Monday evening, Aug. 5, 2024, if you have a very clear view of the western to west-northwestern horizon (particularly with binoculars), you might be able to see the thin, waxing crescent Moon less than a degree above the bright planet Venus, with the bright star Regulus 1.5 degrees below Venus. The planet Mercury (less bright than Regulus) will be 6 degrees to the lower left of Venus. There may only be a short window between when dusk will have faded enough to see Mercury and when Mercury sets 36 minutes after sunset (at 8:50 PM EDT). Regulus will set next nine minutes after Mercury (45 minutes after sunset), followed by Venus eight minutes later (53 minutes after sunset), and the Moon six minutes after that (59 minutes after sunset), six minutes before evening twilight ends (at 9:19 PM). Venus and Regulus will have been at their closest (1 degree apart) the evening before and Mercury and Venus will be at their closest (6 degrees apart) two evenings later, but these will be hard to spot, low on the horizon in the glow of dusk. 

Thursday, Aug. 8, 2024, at 9:32 PM EDT, the Moon will be at apogee, its farthest from the Earth for this orbit. 

Friday evening, Aug. 9, 2024, the bright star Spica will appear 5 degrees to the upper left of the waxing crescent Moon. The Moon will be 14 degrees above the west-southwestern horizon as evening twilight ends (at 9:13 PM EDT). The Moon will set first a little more than an hour later (at 10:35 PM). Saturday morning, for part of the western Pacific north of Australia and Indonesia, the Moon will block Spica from view. See http://lunar-occultations.com/iota/bstar/0810zc1925.htm (external link) for a map and information on locations that can see this occultation. 

By Saturday evening, Aug. 10, 2024, the waxing crescent Moon will have shifted to 7 degrees to the left of the star Spica as evening twilight ends and the pair will separate as the night progresses. 

Saturday night, Aug. 10, 2024, will be the night of the seventh day of the seventh month of the Chinese calendar, known as the double seventh festival, Qixi in China, Chilseok in Korea, and Thất Tịch in Vietnam. The double seventh festival is sometimes called the Chinese Valentine’s Day. There are many variations on the legend, but basically they involve the Milky Way and the three bright stars we know as the Summer Triangle. The star Vega represents the weaver girl and the star Altair represents the cowherd. They fall in love and neglect their duties, so the Goddess of Heaven puts a wide river in the sky, the Milky Way, to keep them apart. They are allowed to meet only one night a year, on the seventh night of the seventh month, when the star Deneb forms a bridge across the Milky Way. In some versions of the legend, the bridge is formed by magpies, so another name is the Magpie Festival. The Japanese Tanabata or Star Festival is related, but is no longer tied to the lunisolar date (it is now celebrated on July 7, the double seventh of the Gregorian Calendar). On average there are a little more than seven days between each quarter of the Moon, so the first quarter Moon tends to occur a day or two after the seventh day of the lunisolar month. 

As described earlier in this post, this should be a good year for the annual Perseids (007 PER) meteor shower, which can peak at more than 100 meteors per hour (under ideal conditions). The time closest to the predicted peak that we can see (from the Washington, D.C. area) will be the early morning of Monday, Aug. 12, 2024. Moonset will be a little before midnight on Aug. 11 and the radiant will rise higher in the north-northeastern sky until the sky shows the first signs of dawn (before morning twilight begins at 5:16 AM). The peak is broad, and in past years high activity has been reported well after the peak, so keep an eye on the sky from moonset to the first hints of dawn on the nights before and after as well. See the meteor shower summary near the beginning of this post for more information on viewing these meteors. 

Monday morning, Aug. 12, 2024, the Moon will appear half-full as it reaches its first quarter at 11:19 AM EDT (when we can’t see it). 

Tuesday night, Aug. 13, 2024, the bright star Antares will appear near the waxing gibbous Moon. Antares will be 2.5 degrees to the upper left as evening twilight ends (at 9:08 PM EDT). By the time of moonset on the southwestern horizon (Wednesday morning at 12:30 AM) Antares will be 1 degree above the Moon. Viewers in the southern part of South America and the Antarctic Peninsula will see the Moon pass in front of Antares. See http://lunar-occultations.com/iota/bstar/0814zc2349.htm (external link) for a map and information on areas that can see this occultation. 

Throughout this lunar cycle the planet Mars will drift toward the bright planet Jupiter. They will be at their closest on Wednesday morning, Aug. 14, 2024, just a third of a degree apart, which should be a good show! Bright Jupiter will rise early in the morning (at 1:18 AM EDT) on the east-northeastern horizon below Mars. They will be 45 degrees above the eastern horizon as morning twilight begins four hours later (at 5:18 AM). 

Friday evening, Aug. 16, 2024, will be the first evening that the planet Saturn will be above the eastern horizon as evening twilight ends (at 9:03 PM EDT). 

Sunday evening, Aug. 18, 2024, the planet Mercury will be passing between Earth and the Sun as seen from Earth, called inferior conjunction. Planets that orbit inside of the orbit of Earth can have two types of conjunctions with the Sun, inferior (when passing between the Earth and the Sun) and superior (when passing on the far side of the Sun as seen from the Earth). Mercury will be shifting from the evening sky to the morning sky and will begin emerging from the glow of dawn on the east-northeastern horizon at the end of August. 

The full Moon after next will be Monday afternoon, Aug. 19, 2024, at 2:26 PM EDT. This will be Tuesday morning from Nepal Standard Time eastward across the rest of Asia and Australia to the International Date Line. The Moon will appear full for about three days around this time, from Sunday morning through early Wednesday morning. As the third full Moon in a season with four full Moons, this will be a Blue Moon (by the older, more traditional definition).

Powered by WPeMatico

Get The Details…