Silicon Valley Event Center – Parking Information

Silicon Valley Event Center – Parking Information

SVEC building locations including parking areas.
SVEC building locations including parking areas.

Where to Park at the Event Center

We have event spaces in multiple buildings. See below for details.

At the main Event Center in building 3, at the front of the building (East side) there is a large lot with standard and accessible spaces. This is the best place to park as it affords the easiest access to the entry doors, which have an ADA accessible ramp. At the rear of the building, there is a secondary large over-flow lot. As this is on the back side of the building, you will need to walk all the way around to enter through the main entrance, or make arrangements to enter through the ADA accessible doors at the rear of the building.

Inside the NASA security fence, at building N232 and the N201 Syverston Auditorium, there is very little parking available and it is first-come first-serve. We highly recommend walking or carpooling to these locations if you are attending an event in either of them

Please keep in mind that if you are driving in, the driver will need a valid, RealID, drivers license. In addition, everyone in the car must have a valid form of ID; Government issued RealID, valid passport, or other form of accepted identification.

Powered by WPeMatico

Get The Details…
Kenny Contreras

Visiting the NASA Silicon Valley Event Center

Visiting the NASA Silicon Valley Event Center

New Electronic Ames Research Center sign a the corner of Arnold Avenue.

Visiting the Event Center

Due to the nature of being a NASA facility, there are some special considerations that must be taken into account.

Traveling To & From
The Event Center is located on the publicly accessible side of the Ames campus. If you plan to arrive via ride share, please be aware that the vehicle and driver must have a valid RealID Drivers License and vehicle registration documents. All passengers will need valid ID as well.

U.S. Citizens must show a valid, officially-issued RealID at the NASA Research Park gate to enter onto the NASA Research Park, where the SVEC is located.
All Foreign Nationals must go through NASA badging procedures to attend meetings at the SVEC.

NASA Transfer Technology and Export Control
If you are having NASA speakers and Non-NASA attendees, your speakers must clear the information with the “NASA” Export Control Office.

Powered by WPeMatico

Get The Details…
Kenny Contreras

NASA Selects Human Space Flight Technical Integration Contractor

NASA Selects Human Space Flight Technical Integration Contractor

The letters NASA on a blue circle with red and white detail, all surrounded by a black background
Credit: NASA

NASA has selected Barrios Technology, LLC, in Houston to provide technical integration services for the agency’s human spaceflight programs.

The Mission Technical Integration Contract is a cost-plus-award-fee and cost-plus-incentive fee contract with core and indefinite-delivery/indefinite-quantity requirements. It has a total estimated value of approximately $450 million, and a period of performance beginning Oct. 1, and ending on Sept. 30, 2027, along with four one-year option periods through 2031.

Under the contract, the contractor will provide technical integration and related services for multiple human spaceflight programs. These services include program, business, configuration and data management, information technology, systems engineering and integration, mission integration, safety and mission assurance, and operations.

For information about the agency and its programs, visit:

https://www.nasa.gov

-end-

Tiernan Doyle
Headquarters, Washington
202-358-1600
tiernan.doyle@nasa.gov

Share

Details

Last Updated

Jul 28, 2025

Powered by WPeMatico

Get The Details…
Tiernan P. Doyle

Curiosity Blog, Sols 4609–4610: Recharged and Ready To Roll Onwards

Curiosity Blog, Sols 4609–4610: Recharged and Ready To Roll Onwards

3 min read

Curiosity Blog, Sols 4609–4610: Recharged and Ready To Roll Onwards

A grayscale photo from the Martian surface shows rough, slightly uneven, dark gray, rocky terrain extending to a plateau that rises in the distance, at the top of the frame. In the foreground, many smaller rocks are poking above the surface, much lighter-toned than the surrounding ground, looking like white specks on the surface.
NASA’s Mars rover Curiosity acquired this image showing the boxwork hollow where it is investigating, and the boxwork ridge on the far side of the hollow, using its Left Navigation Camera. Curiosity captured the image on July 20, 2025 — Sol 4605, or Martian day 4,605 of the Mars Science Laboratory mission — at 18:51:55 UTC.
NASA/JPL-Caltech

Written by Catherine O’Connell-Cooper, Planetary Geologist at University of New Brunswick

Earth planning date: Wednesday, July 23, 2025

For today’s planning, we were in the same workspace as the Monday plan — on purpose! We don’t often have a plan without a drive but in order to allow the battery to recover from some power-hungry SAM atmospheric measurements over the weekend and on Monday, we needed to stay put and skip our usual drive. As a result, we gained a bonus planning cycle at this interesting workspace. 

We are in one of the “hollows” between the resistant ridges of the “boxwork” terrain, as you can see in the image for this blog. This made for a quieter Operations day for me as the APXS planner. As Deborah noted in Monday’s blog, we have already gotten three APXS and MAHLI measurements in this workspace, so we didn’t acquire more in this plan.

This morning, we focused on documenting some small light-toned, rounded, white pebbles in the workspace (you can see them in the accompanying Navcam image), which look very different from the underlying bedrock. We used our one ChemCam LIBS analysis for the plan on “Yana Qaqa.” Mastcam will image this pebble, another at “Ojos del Salado,” and a really cool-looking target with a dendritic-looking texture at “Punta de Lobos.”

Further afield, Mastcam will image the adjacent boxwork ridge and hollow in our drive direction, and a series of troughs with raised edges to the right of our current workspace. ChemCam will image a long-distance RMI mosaic of “Cueva de los Vencejos y Murciélagos,” which was imaged by Mastcam on Monday, and also acquire some further images of the “Mishe Mokwa” hill.

We had a bumper couple of sols of atmospheric measurements over the weekend and Monday. Now we revert back to our more normal environmental and atmospheric monitoring. These do not get as much attention sometimes as the amazing images we take of the fascinating rocks we see, but have been taking place consistently and continuously since Curiosity’s landing almost 13 years ago now. This plan includes a series of Navcam movies (suprahorizon, dust devil) and a line-of-sight observation of dust, standard REMS and DAN observations, and two Mastcam tau measurements, looking at dust in the atmosphere.

Our 24-meter drive (almost 79 feet) will take us out of this hollow and back up on top of a ridge. From here, we hope to be able to spy the best driving path through the boxwork. The ridges are up to 5 meters in diameter (about 16 feet), so we are cautiously hopeful that we can just trundle along one of the ridges as we investigate this fascinating terrain.

Share

Details

Last Updated

Jul 28, 2025

Related Terms

Powered by WPeMatico

Get The Details…