{"id":9756,"date":"2023-12-13T18:05:35","date_gmt":"2023-12-13T22:05:35","guid":{"rendered":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/nasa-stennis-continues-preparations-for-future-artemis-testing\/"},"modified":"2023-12-13T18:05:35","modified_gmt":"2023-12-13T22:05:35","slug":"nasa-stennis-continues-preparations-for-future-artemis-testing","status":"publish","type":"post","link":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/nasa-stennis-continues-preparations-for-future-artemis-testing\/","title":{"rendered":"NASA Stennis Continues Preparations for Future Artemis Testing"},"content":{"rendered":"<h2 style=\"text-align: center;\">NASA Stennis Continues Preparations for Future Artemis Testing<\/h2>\n<p><!-- no image --><\/p>\n<div class=\"padding-top-5 padding-bottom-3 width-full maxw-full hds-module hds-module-full wp-block-nasa-blocks-article-intro\">\n<div class=\"width-full maxw-full article-header\">\n<div class=\"margin-bottom-2 width-full maxw-full\">\n<p class=\"label carbon-60 margin-0 margin-bottom-3 padding-0\">3 min read<\/p>\n<h1 class=\"display-48 margin-bottom-2\">Preparations for Next Moonwalk Simulations Underway (and Underwater)<\/h1>\n<\/div>\n<\/div>\n<\/div>\n<p>Crews at NASA\u2019s Stennis Space Center cleared a milestone Dec. 11, installing a key component in preparation for future Green Run testing of NASA\u2019s new Exploration Upper Stage (EUS) vehicle for use on the SLS (Space Launch System) rocket.<\/p>\n<p>Four large diffusers, each weighing 14 tons, were lifted by crane for installation on the Thad Cochran Test Stand (B-2). The diffusers are a critical component designed to help direct engine exhaust away from the EUS during hot fire testing to minimize heat exposure to sensitive vehicle systems.<\/p>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"1365\" height=\"2048\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?w=1365\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-1-6441.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 1365px) 100vw, 1365px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"1365\" height=\"2048\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?w=1365\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 1365px) 100vw, 1365px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"1365\" height=\"2048\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?w=1365\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-3-6593.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 1365px) 100vw, 1365px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"1365\" height=\"2048\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?w=1365\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-2-6465.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 1365px) 100vw, 1365px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"1365\" height=\"2048\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?w=1365\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-5-6615.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 1365px) 100vw, 1365px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"1365\" height=\"2048\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?w=1365\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-6-6521.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 1365px) 100vw, 1365px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-7-6529.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-8-6555.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"1365\" height=\"2048\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?w=1365\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-9-6570.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 1365px) 100vw, 1365px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-10-6581.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-11-6665.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Installation of a key component of NASA\u2019s new Exploration Upper Stage (EUS) vehicle\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-070-diffuser-12-6686.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\"><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis teams lift and install large diffusers onto the Thad Cochran Test Stand (B-2).<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<p>NASA\u2019s new EUS is being built at NASA\u2019s Michoud Assembly Facility in New Orleans as a more powerful SLS second stage to send the Orion spacecraft and heavier payloads to deep space as NASA continues its mission to explore the secrets of the universe for the benefit of all. The EUS is expected to fly on the Artemis IV mission following a series of Green Run tests of its integrated systems at NASA Stennis to demonstrate it is ready to fly. The test series will culminate with a hot fire of the four RL10 engines that will power the EUS.<\/p>\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube\">\n<div class=\"wp-block-embed__wrapper\">\n<\/div><figcaption class=\"wp-element-caption\">NASA Stennis teams lifted and installed large diffusers onto the Thad Cochran Test Stand (B-2) on December 11, 2023, in preparation for future Green Run testing of the new Exploration Upper Stage before it flies on the SLS (Space Launch System) rocket as part of NASA\u2019s Artemis missions to the Moon and beyond.<\/figcaption><\/figure>\n<p>During an actual flight, critical EUS systems will be protected by the SLS interstage. To protect the systems during Green Run testing, teams are using an interstage simulator, a size-and-weight replica of the actual SLS interstage, and the connected diffusers.<\/p>\n<p>The system requires a high level of precision. The diffusers will be connected to the EUS engine nozzles using a flexible seal so gimbaling, or moving a rocket engine a few degrees along a tight circular axis to direct the thrust and \u201csteer\u201d the vehicle, can occur during testing. They also are designed to facilitate propellant connections and allow test teams access to the engine area as needed.<\/p>\n<p>The carbon steel diffusers were precisely designed by a joint NASA Stennis and Jacobs Engineering team, using computational models, subscale testing, and historical data. The units then were made by Custom Steel Fabricators in Columbia, Tennessee, and delivered by truck to NASA Stennis.<\/p>\n<p>Following lift and installation on the test stand, the diffuser system will be connected to the facility water and hydraulic supplies. A final checkout of the system will include a full test stand water flow demonstration.<\/p>\n<div class=\"nasa-gb-align-full width-full maxw-full padding-x-3 padding-y-0 hds-module hds-module-full wp-block-nasa-blocks-credits-and-details\">\n<section class=\"padding-x-0 padding-top-5 padding-bottom-2 desktop:padding-top-7 desktop:padding-bottom-9\">\n<div class=\"grid-row grid-container maxw-widescreen padding-0\">\n<div class=\"grid-col-12 desktop:grid-col-2 padding-right-4 margin-bottom-5 desktop:margin-bottom-0\">\n<div class=\"padding-top-3 border-top-1px border-color-carbon-black\">\n<div class=\"margin-bottom-2\">\n<h2 class=\"heading-14\">Share<\/h2>\n<\/p><\/div>\n<div class=\"padding-bottom-2\">\n<ul class=\"social-icons social-icons-round\">\n<li class=\"social-icon social-icon-x\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/x.com\/intent\/tweet?via=NASA&#038;text=NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing&#038;url=https%3A%2F%2Fwww.nasa.gov%2Fcenters-and-facilities%2Fstennis%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" aria-label=\"Share on X.\"><br \/>\n\t\t\t\t\t\t\t\t<svg width=\"1200\" height=\"1227\" viewbox=\"0 0 1200 1227\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M714.163 519.284L1160.89 0H1055.03L667.137 450.887L357.328 0H0L468.492 681.821L0 1226.37H105.866L515.491 750.218L842.672 1226.37H1200L714.137 519.284H714.163ZM569.165 687.828L521.697 619.934L144.011 79.6944H306.615L611.412 515.685L658.88 583.579L1055.08 1150.3H892.476L569.165 687.854V687.828Z\" fill=\"white\"><\/path><\/svg><br \/>\n\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n<li class=\"social-icon social-icon-facebook\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Fwww.nasa.gov%2Fcenters-and-facilities%2Fstennis%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" aria-label=\"Share on Facebook.\"><br \/>\n\t\t\t\t\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 24 24\" aria-hidden=\"true\"><path d=\"M9 8h-3v4h3v12h5v-12h3.642l.358-4h-4v-1.667c0-.955.192-1.333 1.115-1.333h2.885v-5h-3.808c-3.596 0-5.192 1.583-5.192 4.615v3.385z\"><\/path><\/svg><br \/>\n\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n<li class=\"social-icon social-icon-linkedin\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.linkedin.com\/shareArticle?mini=true&#038;url=https%3A%2F%2Fwww.nasa.gov%2Fcenters-and-facilities%2Fstennis%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" aria-label=\"Share on LinkedIn.\"><br \/>\n\t\t\t\t\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 24 24\" aria-hidden=\"true\"><path d=\"M4.98 3.5c0 1.381-1.11 2.5-2.48 2.5s-2.48-1.119-2.48-2.5c0-1.38 1.11-2.5 2.48-2.5s2.48 1.12 2.48 2.5zm.02 4.5h-5v16h5v-16zm7.982 0h-4.968v16h4.969v-8.399c0-4.67 6.029-5.052 6.029 0v8.399h4.988v-10.131c0-7.88-8.922-7.593-11.018-3.714v-2.155z\"><\/path><\/svg><br \/>\n\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n<li class=\"social-icon social-icon-rss\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/feed\/\" aria-label=\"Subscribe to RSS feed.\"><br \/>\n\t\t\t\t\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 800 800\" aria-hidden=\"true\"><path d=\"M493 652H392c0-134-111-244-244-244V307c189 0 345 156 345 345zm71 0c0-228-188-416-416-416V132c285 0 520 235 520 520z\"><\/path><circle cx=\"219\" cy=\"581\" r=\"71\"><\/circle><\/svg><br \/>\n\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n<\/ul><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"grid-col-12 desktop:grid-col-5 padding-right-4 margin-bottom-5 desktop:margin-bottom-0\">\n<div class=\"padding-top-3 border-top-1px border-color-carbon-black\">\n<div class=\"margin-bottom-2\">\n<h2 class=\"heading-14\">Details<\/h2>\n<\/p><\/div>\n<div class=\"grid-row margin-bottom-3\">\n<div class=\"grid-col-4\">\n<div class=\"subheading\">Last Updated<\/div>\n<\/p><\/div>\n<div class=\"grid-col-8\">Dec 13, 2023<\/div>\n<\/p><\/div>\n<div class=\"grid-row margin-bottom-3\">\n<div class=\"grid-col-4\">\n<div class=\"subheading\">Editor<\/div>\n<\/div>\n<div class=\"grid-col-8\">NASA Stennis Communications<\/div>\n<\/div>\n<div class=\"grid-row margin-bottom-3\">\n<div class=\"grid-col-4\">\n<div class=\"subheading\">Contact<\/div>\n<\/div>\n<div class=\"grid-col-8\">\n<div class=\"margin-bottom-3\">\n<div>C. Lacy Thompson<\/div>\n<div><a href=\"mailto:calvin.l.thompson@nasa.gov\">calvin.l.thompson@nasa.gov<\/a> \/ (228) 688-3333<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"grid-row\">\n<div class=\"grid-col-4\">\n<div class=\"subheading\">Location<\/div>\n<\/div>\n<div class=\"grid-col-8\">Stennis Space Center<\/div>\n<\/div><\/div>\n<\/p><\/div>\n<div class=\"grid-col-12 desktop:grid-col-5 padding-right-4 margin-bottom-5 desktop:margin-bottom-0\">\n<div class=\"padding-top-3 border-top-1px border-color-carbon-black \">\n<div class=\"margin-bottom-2\">\n<h2 class=\"heading-14\">Related Terms<\/h2>\n<\/div>\n<ul class=\"article-tags\">\n<li class=\"article-tag\"><a href=\"https:\/\/www.nasa.gov\/stennis-space-center\/\">Stennis Space Center<\/a><\/li>\n<li class=\"article-tag\"><a href=\"https:\/\/www.nasa.gov\/marshall-space-flight-center\/\">Marshall Space Flight Center<\/a><\/li>\n<li class=\"article-tag\"><a href=\"https:\/\/www.nasa.gov\/michoud-assembly-facility\/\">Michoud Assembly Facility<\/a><\/li>\n<li class=\"article-tag\"><a href=\"https:\/\/www.nasa.gov\/directorates\/esdmd\/common-exploration-systems-development-division\/space-launch-system\/\">Space Launch System (SLS)<\/a><\/li>\n<\/ul>\n<\/div>\n<\/div><\/div>\n<\/section><\/div>\n<div class=\"nasa-gb-align-full width-full maxw-full padding-x-3 padding-y-0 hds-module hds-module-full wp-block-nasa-blocks-related-articles\">\n<section class=\"hds-related-articles padding-x-0 padding-y-3 desktop:padding-top-7 desktop:padding-bottom-9\">\n<div class=\"w-100 grid-row grid-container maxw-widescreen padding-0 text-align-left\">\n<div class=\"margin-bottom-4\">\n<h2 class=\"width-full w-full maxw-full\">Explore More<\/h2>\n<\/div><\/div>\n<div class=\"grid-row grid-container maxw-widescreen padding-0\">\n<div class=\"grid-col-12 desktop:grid-col-4 margin-bottom-4 desktop:margin-bottom-0 desktop:padding-right-3\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/stennis\/nasa-stennis-engineers-share-the-stage-on-test-day\/\" class=\"color-carbon-black\"><\/p>\n<div class=\"margin-bottom-2\">\n<div class=\"hds-cover-wrapper cover-hover-zoom bg-carbon-black minh-mobile\">\n<figure class=\"hds-media-background  \"><img loading=\"lazy\" width=\"300\" height=\"185\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?w=300\" class=\"attachment-medium size-medium\" alt=\"\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg 3400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=300,185 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=768,474 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=1024,632 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=1536,949 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=2048,1265 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=400,247 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=600,371 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=900,556 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=1200,741 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/s23-069-greiner-and-pinson.jpg?resize=2000,1235 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\"><\/figure>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"padding-right-0 desktop:padding-right-10\">\n<div class=\"subheading margin-bottom-1\">3 min read<\/div>\n<div class=\"margin-bottom-1\">\n<h3 class=\"related-article-title\">NASA Stennis Engineers Share the Stage on Test Day<\/h3>\n<\/div>\n<div class=\"display-flex flex-align-center label related-article-label margin-bottom-1 color-carbon-60\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-flex flex-align-center margin-right-2\"><br \/>\n\t\t\t\t\t\t\t\t\t\t<svg version=\"1.1\" class=\"square-2 margin-right-1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" x=\"0px\" y=\"0px\" width=\"16px\" height=\"16px\" viewbox=\"0 0 16 16\" xml:space=\"preserve\"><g><g><path d=\"M8,0C3.5,0-0.1,3.7,0,8.2C0.1,12.5,3.6,16,8,16c4.4,0,8-3.6,8-8C16,3.5,12.4,0,8,0z M8,15.2 C4,15.2,0.8,12,0.8,8C0.8,4,4,0.8,8,0.8c3.9,0,7.2,3.2,7.2,7.1C15.2,11.9,12,15.2,8,15.2z\"><\/path><path d=\"M5.6,12c0.8-0.8,1.6-1.6,2.4-2.4c0.8,0.8,1.6,1.6,2.4,2.4c0-2.7,0-5.3,0-8C8.8,4,7.2,4,5.6,4 C5.6,6.7,5.6,9.3,5.6,12z\"><\/path><\/g><\/g><\/svg><br \/>\n\t\t\t\t\t\t\t\t\t\t<span>Article<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<span class=\"\"><br \/>\n\t\t\t\t\t\t\t\t\t\t1 day ago\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t<\/div>\n<\/p><\/div>\n<p>\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n<div class=\"grid-col-12 desktop:grid-col-4 margin-bottom-4 desktop:margin-bottom-0 desktop:padding-right-3\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/missions\/ixpe\/nasas-ixpe-marks-two-years-of-groundbreaking-x-ray-astronomy\/\" class=\"color-carbon-black\"><\/p>\n<div class=\"margin-bottom-2\">\n<div class=\"hds-cover-wrapper cover-hover-zoom bg-carbon-black minh-mobile\">\n<figure class=\"hds-media-background  \"><img loading=\"lazy\" width=\"300\" height=\"300\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?w=300\" class=\"attachment-medium size-medium\" alt=\"\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg 985w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=150,150 150w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=300,300 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=768,768 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=50,50 50w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=100,100 100w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=200,200 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=400,400 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=600,600 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/05\/cena-ixpe.jpeg?resize=900,900 900w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\"><\/figure>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"padding-right-0 desktop:padding-right-10\">\n<div class=\"subheading margin-bottom-1\">5 min read<\/div>\n<div class=\"margin-bottom-1\">\n<h3 class=\"related-article-title\">NASA\u2019s IXPE Marks Two Years of Groundbreaking X-ray Astronomy<\/h3>\n<\/div>\n<div class=\"display-flex flex-align-center label related-article-label margin-bottom-1 color-carbon-60\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-flex flex-align-center margin-right-2\"><br \/>\n\t\t\t\t\t\t\t\t\t\t<svg version=\"1.1\" class=\"square-2 margin-right-1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" x=\"0px\" y=\"0px\" width=\"16px\" height=\"16px\" viewbox=\"0 0 16 16\" xml:space=\"preserve\"><g><g><path d=\"M8,0C3.5,0-0.1,3.7,0,8.2C0.1,12.5,3.6,16,8,16c4.4,0,8-3.6,8-8C16,3.5,12.4,0,8,0z M8,15.2 C4,15.2,0.8,12,0.8,8C0.8,4,4,0.8,8,0.8c3.9,0,7.2,3.2,7.2,7.1C15.2,11.9,12,15.2,8,15.2z\"><\/path><path d=\"M5.6,12c0.8-0.8,1.6-1.6,2.4-2.4c0.8,0.8,1.6,1.6,2.4,2.4c0-2.7,0-5.3,0-8C8.8,4,7.2,4,5.6,4 C5.6,6.7,5.6,9.3,5.6,12z\"><\/path><\/g><\/g><\/svg><br \/>\n\t\t\t\t\t\t\t\t\t\t<span>Article<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<span class=\"\"><br \/>\n\t\t\t\t\t\t\t\t\t\t5 days ago\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t<\/div>\n<\/p><\/div>\n<p>\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n<div class=\"grid-col-12 desktop:grid-col-4 margin-bottom-4 desktop:margin-bottom-0 desktop:padding-right-3\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/marshall\/the-marshall-star-for-december-6-2023\/\" class=\"color-carbon-black\"><\/p>\n<div class=\"margin-bottom-2\">\n<div class=\"hds-cover-wrapper cover-hover-zoom bg-carbon-black minh-mobile\">\n<figure class=\"hds-media-background  \"><img loading=\"lazy\" width=\"300\" height=\"205\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?w=300\" class=\"attachment-medium size-medium\" alt=\"\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=300,205 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=768,524 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=1024,698 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=1536,1047 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=2048,1397 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=400,273 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=600,409 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=900,614 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=1200,818 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/12\/ceb-5780.jpg?resize=2000,1364 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\"><\/figure>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"padding-right-0 desktop:padding-right-10\">\n<div class=\"subheading margin-bottom-1\">23 min read<\/div>\n<div class=\"margin-bottom-1\">\n<h3 class=\"related-article-title\">The Marshall Star for December 6, 2023<\/h3>\n<\/div>\n<div class=\"display-flex flex-align-center label related-article-label margin-bottom-1 color-carbon-60\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-flex flex-align-center margin-right-2\"><br \/>\n\t\t\t\t\t\t\t\t\t\t<svg version=\"1.1\" class=\"square-2 margin-right-1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" x=\"0px\" y=\"0px\" width=\"16px\" height=\"16px\" viewbox=\"0 0 16 16\" xml:space=\"preserve\"><g><g><path d=\"M8,0C3.5,0-0.1,3.7,0,8.2C0.1,12.5,3.6,16,8,16c4.4,0,8-3.6,8-8C16,3.5,12.4,0,8,0z M8,15.2 C4,15.2,0.8,12,0.8,8C0.8,4,4,0.8,8,0.8c3.9,0,7.2,3.2,7.2,7.1C15.2,11.9,12,15.2,8,15.2z\"><\/path><path d=\"M5.6,12c0.8-0.8,1.6-1.6,2.4-2.4c0.8,0.8,1.6,1.6,2.4,2.4c0-2.7,0-5.3,0-8C8.8,4,7.2,4,5.6,4 C5.6,6.7,5.6,9.3,5.6,12z\"><\/path><\/g><\/g><\/svg><br \/>\n\t\t\t\t\t\t\t\t\t\t<span>Article<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<span class=\"\"><br \/>\n\t\t\t\t\t\t\t\t\t\t7 days ago\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t<\/div>\n<\/p><\/div>\n<p>\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n<\/p><\/div>\n<\/section><\/div>\n<div class=\"hds-topic-cards nasa-gb-align-full maxw-full width-full padding-y-6 padding-x-3 color-mode-dark hds-module hds-module-full wp-block-nasa-blocks-topic-cards\">\n<div class=\"grid-container grid-container-block-lg padding-x-0\">\n<div class=\"grid-row flex-align-center margin-bottom-3\">\n<div class=\"desktop:grid-col-8 margin-bottom-2 desktop:margin-bottom-0\">\n<div class=\"label color-carbon-60 margin-bottom-2\">Keep Exploring<\/div>\n<h2 class=\"heading-36 line-height-sm\">Discover More Topics From NASA<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"grid-row grid-gap-2 hds-topic-cards-wrapper\">\n\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/stennis\/doing-business-with-stennis\/\" class=\"mobile:grid-col-12 tablet:grid-col-6 desktop:grid-col-3 topic-card margin-bottom-4 desktop:margin-bottom-0\"><\/p>\n<div class=\"hds-topic-card hds-cover-wrapper cover-hover-zoom bg-carbon-black\">\n<div class=\"skrim-overlay skrim-overlay-dark skrim-left mobile-skrim-top padding-3 display-flex flex-align-end flex-justify-start z-200\">\n<div>\n<p class=\"hds-topic-card-heading heading-29 color-spacesuit-white line-height-sm margin-top-0 margin-bottom-1\">\n\t\t\t\t\t\t\t\t<span>Doing Business with NASA Stennis<\/span><br \/>\n\t\t\t\t\t\t\t\t<svg viewbox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><circle class=\"color-nasa-red\" cx=\"16\" cy=\"16\" r=\"16\"><\/circle><path d=\"M8 16.956h12.604l-3.844 4.106 1.252 1.338L24 16l-5.988-6.4-1.252 1.338 3.844 4.106H8v1.912z\" class=\"color-spacesuit-white\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<figure class=\"hds-media-background  \"><img loading=\"lazy\" width=\"1536\" height=\"1022\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?w=1536\" class=\"attachment-1536x1536 size-1536x1536\" alt=\"\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg 4256w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=768,511 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=1024,681 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=1536,1022 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=2048,1363 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=400,266 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=600,399 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=900,599 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=1200,798 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=2000,1331 2000w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\"><\/figure>\n<\/p><\/div>\n<p>\t\t\t<\/a><br \/>\n\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/stennis\/about-stennis\/\" class=\"mobile:grid-col-12 tablet:grid-col-6 desktop:grid-col-3 topic-card margin-bottom-4 desktop:margin-bottom-0\"><\/p>\n<div class=\"hds-topic-card hds-cover-wrapper cover-hover-zoom bg-carbon-black\">\n<div class=\"skrim-overlay skrim-overlay-dark skrim-left mobile-skrim-top padding-3 display-flex flex-align-end flex-justify-start z-200\">\n<div>\n<p class=\"hds-topic-card-heading heading-29 color-spacesuit-white line-height-sm margin-top-0 margin-bottom-1\">\n\t\t\t\t\t\t\t\t<span>About NASA Stennis<\/span><br \/>\n\t\t\t\t\t\t\t\t<svg viewbox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><circle class=\"color-nasa-red\" cx=\"16\" cy=\"16\" r=\"16\"><\/circle><path d=\"M8 16.956h12.604l-3.844 4.106 1.252 1.338L24 16l-5.988-6.4-1.252 1.338 3.844 4.106H8v1.912z\" class=\"color-spacesuit-white\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<figure class=\"hds-media-background  \"><img loading=\"lazy\" width=\"879\" height=\"485\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/ssc-20180630-s01138h.jpg?w=879\" class=\"attachment-1536x1536 size-1536x1536\" alt=\"\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/ssc-20180630-s01138h.jpg 879w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/ssc-20180630-s01138h.jpg?resize=300,166 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/ssc-20180630-s01138h.jpg?resize=768,424 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/ssc-20180630-s01138h.jpg?resize=400,221 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/ssc-20180630-s01138h.jpg?resize=600,331 600w\" sizes=\"auto, (max-width: 879px) 100vw, 879px\"><\/figure>\n<\/p><\/div>\n<p>\t\t\t<\/a><br \/>\n\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/stennis\/visit-stennis\/\" class=\"mobile:grid-col-12 tablet:grid-col-6 desktop:grid-col-3 topic-card margin-bottom-4 desktop:margin-bottom-0\"><\/p>\n<div class=\"hds-topic-card hds-cover-wrapper cover-hover-zoom bg-carbon-black\">\n<div class=\"skrim-overlay skrim-overlay-dark skrim-left mobile-skrim-top padding-3 display-flex flex-align-end flex-justify-start z-200\">\n<div>\n<p class=\"hds-topic-card-heading heading-29 color-spacesuit-white line-height-sm margin-top-0 margin-bottom-1\">\n\t\t\t\t\t\t\t\t<span>Visit NASA Stennis<\/span><br \/>\n\t\t\t\t\t\t\t\t<svg viewbox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><circle class=\"color-nasa-red\" cx=\"16\" cy=\"16\" r=\"16\"><\/circle><path d=\"M8 16.956h12.604l-3.844 4.106 1.252 1.338L24 16l-5.988-6.4-1.252 1.338 3.844 4.106H8v1.912z\" class=\"color-spacesuit-white\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<figure class=\"hds-media-background  \"><img loading=\"lazy\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?w=1536\" class=\"attachment-1536x1536 size-1536x1536\" alt=\"\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg 2560w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=2048,1366 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/02\/infinity-walk.jpeg?resize=2000,1334 2000w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\"><\/figure>\n<\/p><\/div>\n<p>\t\t\t<\/a><br \/>\n\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/stennis\/media-resources\/\" class=\"mobile:grid-col-12 tablet:grid-col-6 desktop:grid-col-3 topic-card margin-bottom-4 desktop:margin-bottom-0\"><\/p>\n<div class=\"hds-topic-card hds-cover-wrapper cover-hover-zoom bg-carbon-black\">\n<div class=\"skrim-overlay skrim-overlay-dark skrim-left mobile-skrim-top padding-3 display-flex flex-align-end flex-justify-start z-200\">\n<div>\n<p class=\"hds-topic-card-heading heading-29 color-spacesuit-white line-height-sm margin-top-0 margin-bottom-1\">\n\t\t\t\t\t\t\t\t<span>NASA Stennis Media Resources<\/span><br \/>\n\t\t\t\t\t\t\t\t<svg viewbox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><circle class=\"color-nasa-red\" cx=\"16\" cy=\"16\" r=\"16\"><\/circle><path d=\"M8 16.956h12.604l-3.844 4.106 1.252 1.338L24 16l-5.988-6.4-1.252 1.338 3.844 4.106H8v1.912z\" class=\"color-spacesuit-white\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<figure class=\"hds-media-background  \"><img loading=\"lazy\" width=\"1536\" height=\"1020\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?w=1536\" class=\"attachment-1536x1536 size-1536x1536\" alt=\"\" decoding=\"async\" block_context=\"nasa-block\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg 2784w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=300,199 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=768,510 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=1024,680 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=1536,1020 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=2048,1359 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=400,266 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=600,398 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=900,597 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=1200,797 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2021\/11\/ssc-2010-02732h_-_general.jpg?resize=2000,1328 2000w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\"><\/figure>\n<\/p><\/div>\n<p>\t\t\t<\/a>\n\t\t\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<p class=\"wpematico_credit\"><small>Powered by <a href=\"http:\/\/www.wpematico.com\" target=\"_blank\" rel=\"noopener\">WPeMatico<\/a><\/small><\/p>\n<p><a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/stennis\/nasa-stennis-continues-preparations-for-future-artemis-testing\/\" target=\"_blank\" rel=\"noopener\">Get The Details&#8230;<\/a><br \/>\nLaToya Dean  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Crews at NASA\u2019s Stennis Space Center cleared a milestone Dec. 11, installing a key component in preparation for future Green Run testing of NASA\u2019s new Exploration Upper Stage (EUS) vehicle for use on the SLS (Space Launch System) rocket. Four large diffusers, each weighing 14 tons, were lifted by crane for installation on the Thad [\u2026] <a class=\"continue-reading-link\" href=\"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/nasa-stennis-continues-preparations-for-future-artemis-testing\/\"> Continue reading <span class=\"meta-nav\">&rarr; <\/span><\/a><\/p>\n<div class='heateorSssClear'><\/div><div  class='heateor_sss_sharing_container heateor_sss_horizontal_sharing' data-heateor-sss-href='https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/nasa-stennis-continues-preparations-for-future-artemis-testing\/'><div class='heateor_sss_sharing_title' style=\"font-weight:bold\" >Spread the love<\/div><div class=\"heateor_sss_sharing_ul\"><a aria-label=\"Facebook\" class=\"heateor_sss_facebook\" href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"Facebook\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#0765FE;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M28 16c0-6.627-5.373-12-12-12S4 9.373 4 16c0 5.628 3.875 10.35 9.101 11.647v-7.98h-2.474V16H13.1v-1.58c0-4.085 1.849-5.978 5.859-5.978.76 0 2.072.15 2.608.298v3.325c-.283-.03-.775-.045-1.386-.045-1.967 0-2.728.745-2.728 2.683V16h3.92l-.673 3.667h-3.247v8.245C23.395 27.195 28 22.135 28 16Z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Twitter\" class=\"heateor_sss_button_twitter\" href=\"https:\/\/twitter.com\/intent\/tweet?via=alcowep&text=NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing&url=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"Twitter\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_twitter\" style=\"background-color:#55acee;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-4 -4 39 39\"><path d=\"M28 8.557a9.913 9.913 0 0 1-2.828.775 4.93 4.93 0 0 0 2.166-2.725 9.738 9.738 0 0 1-3.13 1.194 4.92 4.92 0 0 0-3.593-1.55 4.924 4.924 0 0 0-4.794 6.049c-4.09-.21-7.72-2.17-10.15-5.15a4.942 4.942 0 0 0-.665 2.477c0 1.71.87 3.214 2.19 4.1a4.968 4.968 0 0 1-2.23-.616v.06c0 2.39 1.7 4.38 3.952 4.83-.414.115-.85.174-1.297.174-.318 0-.626-.03-.928-.086a4.935 4.935 0 0 0 4.6 3.42 9.893 9.893 0 0 1-6.114 2.107c-.398 0-.79-.023-1.175-.068a13.953 13.953 0 0 0 7.55 2.213c9.056 0 14.01-7.507 14.01-14.013 0-.213-.005-.426-.015-.637.96-.695 1.795-1.56 2.455-2.55z\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Vkontakte\" class=\"heateor_sss_button_vkontakte\" href=\"https:\/\/vkontakte.ru\/share.php?&url=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"Vkontakte\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_vkontakte\" style=\"background-color:#0077FF;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" fill=\"none\" height=\"100%\" width=\"100%\" viewBox=\"0.75 6 46 37\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\"><path d=\"M25.54 34.58c-10.94 0-17.18-7.5-17.44-19.98h5.48c.18 9.16 4.22 13.04 7.42 13.84V14.6h5.16v7.9c3.16-.34 6.48-3.94 7.6-7.9h5.16c-.86 4.88-4.46 8.48-7.02 9.96 2.56 1.2 6.66 4.34 8.22 10.02h-5.68c-1.22-3.8-4.26-6.74-8.28-7.14v7.14z\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Email\" class=\"heateor_sss_email\" href=\"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/nasa-stennis-continues-preparations-for-future-artemis-testing\/\" onclick=\"event.preventDefault();window.open('mailto:?subject=' + decodeURIComponent('NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing').replace('&', '%26') + '&body=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F', '_blank')\" title=\"Email\" rel=\"noopener\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#649a3f;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-.75 -.5 36 36\"><path d=\"M 5.5 11 h 23 v 1 l -11 6 l -11 -6 v -1 m 0 2 l 11 6 l 11 -6 v 11 h -22 v -11\" stroke-width=\"1\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Gmail\" class=\"heateor_sss_button_google_gmail\" href=\"https:\/\/mail.google.com\/mail\/?ui=2&view=cm&fs=1&tf=1&su=NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing&body=Link:https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"Google Gmail\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_Google_Gmail\" style=\"background-color:#e5e5e5;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M2.902 6.223h26.195v19.554H2.902z\"><\/path><path fill=\"#E14C41\" class=\"heateor_sss_no_fill\" d=\"M2.902 25.777h26.195V6.223H2.902v19.554zm22.44-4.007v3.806H6.955v-3.6h.032l.093-.034 6.9-5.558 2.09 1.77 1.854-1.63 7.42 5.246zm0-.672l-7.027-4.917 7.028-6.09V21.1zm-1.17-14.67l-.947.905c-2.356 2.284-4.693 4.75-7.17 6.876l-.078.06L8.062 6.39l16.11.033zm-10.597 9.61l-6.62 5.294.016-10.914 6.607 5.62\"><\/path><\/svg><\/span><\/a><a aria-label=\"Whatsapp\" class=\"heateor_sss_whatsapp\" href=\"https:\/\/api.whatsapp.com\/send?text=NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing%20https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"Whatsapp\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#55eb4c;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-6 -5 40 40\"><path class=\"heateor_sss_svg_stroke heateor_sss_no_fill\" stroke=\"#fff\" stroke-width=\"2\" fill=\"none\" d=\"M 11.579798566743314 24.396926207859085 A 10 10 0 1 0 6.808479557110079 20.73576436351046\"><\/path><path d=\"M 7 19 l -1 6 l 6 -1\" class=\"heateor_sss_no_fill heateor_sss_svg_stroke\" stroke=\"#fff\" stroke-width=\"2\" fill=\"none\"><\/path><path d=\"M 10 10 q -1 8 8 11 c 5 -1 0 -6 -1 -3 q -4 -3 -5 -5 c 4 -2 -1 -5 -1 -4\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Instagram\" class=\"heateor_sss_button_instagram\" href=\"https:\/\/www.instagram.com\/\" title=\"Instagram\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#53beee;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" version=\"1.1\" viewBox=\"-10 -10 148 148\" width=\"100%\" height=\"100%\" xml:space=\"preserve\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"https:\/\/www.w3.org\/1999\/xlink\"><g><g><path d=\"M86,112H42c-14.336,0-26-11.663-26-26V42c0-14.337,11.664-26,26-26h44c14.337,0,26,11.663,26,26v44 C112,100.337,100.337,112,86,112z M42,24c-9.925,0-18,8.074-18,18v44c0,9.925,8.075,18,18,18h44c9.926,0,18-8.075,18-18V42 c0-9.926-8.074-18-18-18H42z\" fill=\"#fff\"><\/path><\/g><g><path d=\"M64,88c-13.234,0-24-10.767-24-24c0-13.234,10.766-24,24-24s24,10.766,24,24C88,77.233,77.234,88,64,88z M64,48c-8.822,0-16,7.178-16,16s7.178,16,16,16c8.822,0,16-7.178,16-16S72.822,48,64,48z\" fill=\"#fff\"><\/path><\/g><g><circle cx=\"89.5\" cy=\"38.5\" fill=\"#fff\" r=\"5.5\"><\/circle><\/g><\/g><\/svg><\/span><\/a><a aria-label=\"Pinterest\" class=\"heateor_sss_button_pinterest\" href=\"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/nasa-stennis-continues-preparations-for-future-artemis-testing\/\" onclick=\"event.preventDefault();javascript:void( (function() {var e=document.createElement('script' );e.setAttribute('type','text\/javascript' );e.setAttribute('charset','UTF-8' );e.setAttribute('src','\/\/assets.pinterest.com\/js\/pinmarklet.js?r='+Math.random()*99999999);document.body.appendChild(e)})());\" title=\"Pinterest\" rel=\"noopener\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_pinterest\" style=\"background-color:#cc2329;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-2 -2 35 35\"><path fill=\"#fff\" d=\"M16.539 4.5c-6.277 0-9.442 4.5-9.442 8.253 0 2.272.86 4.293 2.705 5.046.303.125.574.005.662-.33.061-.231.205-.816.27-1.06.088-.331.053-.447-.191-.736-.532-.627-.873-1.439-.873-2.591 0-3.338 2.498-6.327 6.505-6.327 3.548 0 5.497 2.168 5.497 5.062 0 3.81-1.686 7.025-4.188 7.025-1.382 0-2.416-1.142-2.085-2.545.397-1.674 1.166-3.48 1.166-4.689 0-1.081-.581-1.983-1.782-1.983-1.413 0-2.548 1.462-2.548 3.419 0 1.247.421 2.091.421 2.091l-1.699 7.199c-.505 2.137-.076 4.755-.039 5.019.021.158.223.196.314.077.13-.17 1.813-2.247 2.384-4.324.162-.587.929-3.631.929-3.631.46.876 1.801 1.646 3.227 1.646 4.247 0 7.128-3.871 7.128-9.053.003-3.918-3.317-7.568-8.361-7.568z\"\/><\/svg><\/span><\/a><a aria-label=\"Linkedin\" class=\"heateor_sss_button_linkedin\" href=\"https:\/\/www.linkedin.com\/sharing\/share-offsite\/?url=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"Linkedin\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_linkedin\" style=\"background-color:#0077b5;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path d=\"M6.227 12.61h4.19v13.48h-4.19V12.61zm2.095-6.7a2.43 2.43 0 0 1 0 4.86c-1.344 0-2.428-1.09-2.428-2.43s1.084-2.43 2.428-2.43m4.72 6.7h4.02v1.84h.058c.56-1.058 1.927-2.176 3.965-2.176 4.238 0 5.02 2.792 5.02 6.42v7.395h-4.183v-6.56c0-1.564-.03-3.574-2.178-3.574-2.18 0-2.514 1.7-2.514 3.46v6.668h-4.187V12.61z\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Mix\" class=\"heateor_sss_button_mix\" href=\"https:\/\/mix.com\/mixit?url=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"Mix\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_mix\" style=\"background-color:#ff8226;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-7 -8 45 45\"><g fill=\"#fff\"><path opacity=\".8\" d=\"M27.87 4.125c-5.224 0-9.467 4.159-9.467 9.291v2.89c0-1.306 1.074-2.362 2.399-2.362s2.399 1.056 2.399 2.362v1.204c0 1.306 1.074 2.362 2.399 2.362s2.399-1.056 2.399-2.362V4.134c-.036-.009-.082-.009-.129-.009\"\/><path d=\"M4 4.125v12.94c2.566 0 4.668-1.973 4.807-4.465v-2.214c0-.065 0-.12.009-.176.093-1.213 1.13-2.177 2.39-2.177 1.325 0 2.399 1.056 2.399 2.362v9.226c0 1.306 1.074 2.353 2.399 2.353s2.399-1.056 2.399-2.353v-6.206c0-5.132 4.233-9.291 9.467-9.291H4z\"\/><path opacity=\".8\" d=\"M4 17.074v8.438c0 1.306 1.074 2.362 2.399 2.362s2.399-1.056 2.399-2.362V12.61C8.659 15.102 6.566 17.074 4 17.074\"\/><\/g><\/svg><\/span><\/a><a aria-label=\"MeWe\" class=\"heateor_sss_MeWe\" href=\"https:\/\/mewe.com\/share?link=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"MeWe\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#007da1;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-4 -3 38 38\"><g fill=\"#fff\"><path d=\"M9.636 10.427a1.22 1.22 0 1 1-2.44 0 1.22 1.22 0 1 1 2.44 0zM15.574 10.431a1.22 1.22 0 0 1-2.438 0 1.22 1.22 0 1 1 2.438 0zM22.592 10.431a1.221 1.221 0 1 1-2.443 0 1.221 1.221 0 0 1 2.443 0zM29.605 10.431a1.221 1.221 0 1 1-2.442 0 1.221 1.221 0 0 1 2.442 0zM3.605 13.772c0-.471.374-.859.859-.859h.18c.374 0 .624.194.789.457l2.935 4.597 2.95-4.611c.18-.291.43-.443.774-.443h.18c.485 0 .859.387.859.859v8.113a.843.843 0 0 1-.859.845.857.857 0 0 1-.845-.845V16.07l-2.366 3.559c-.18.276-.402.443-.72.443-.304 0-.526-.167-.706-.443l-2.354-3.53V21.9c0 .471-.374.83-.845.83a.815.815 0 0 1-.83-.83v-8.128h-.001zM14.396 14.055a.9.9 0 0 1-.069-.333c0-.471.402-.83.872-.83.415 0 .735.263.845.624l2.23 6.66 2.187-6.632c.139-.402.428-.678.859-.678h.124c.428 0 .735.278.859.678l2.187 6.632 2.23-6.675c.126-.346.415-.609.83-.609.457 0 .845.361.845.817a.96.96 0 0 1-.083.346l-2.867 8.032c-.152.43-.471.706-.887.706h-.165c-.415 0-.721-.263-.872-.706l-2.161-6.328-2.16 6.328c-.152.443-.47.706-.887.706h-.165c-.415 0-.72-.263-.887-.706l-2.865-8.032z\"><\/path><\/g><\/svg><\/span><\/a><a aria-label=\"Yahoo Mail\" class=\"heateor_sss_button_yahoo_mail\" href=\"\/\/compose.mail.yahoo.com\/?Subject=NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing&body=Link:https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"Yahoo Mail\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_yahoo\" style=\"background-color:#400090;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M21.495 6.097c1.09.31 2.213.28 3.304 0l-7.42 12.09v9.91a4.366 4.366 0 0 0-1.37-.22c-.47 0-.937.065-1.404.22v-9.91L7.19 6.097c1.09.28 2.213.31 3.304 0l5.516 8.788 5.483-8.787z\"><\/path><\/svg><\/span><\/a><a aria-label=\"AOL Mail\" class=\"heateor_sss_button_aoL_mail\" href=\"https:\/\/webmail.aol.com\/25045\/aol\/en-us\/Mail\/compose-message.aspx?subject=NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing&body=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" title=\"AOL Mail\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_aoL_mail\" style=\"background-color:#2a2a2a;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path d=\"M17.334 13.26c-2.315 0-4.067 1.8-4.067 4.027 0 2.35 1.824 4.03 4.067 4.03 2.243 0 4.062-1.68 4.062-4.03 0-2.228-1.744-4.027-4.062-4.027zm0 2.127c1-.007 1.82.847 1.82 1.9 0 1.048-.82 1.9-1.82 1.9s-1.818-.853-1.818-1.9c0-1.053.817-1.9 1.818-1.9zm11.59 4.518c0 .778-.63 1.412-1.41 1.412-.778 0-1.41-.634-1.41-1.412 0-.778.632-1.408 1.41-1.408.78 0 1.41.63 1.41 1.408zm-4.104 1.418h-2.216v-10.28h2.216v10.28zM9.33 11.04s2.585 6.79 3.862 10.13c.015.037.028.078.047.132-.06.006-.105.01-.15.01-.83.002-1.664-.003-2.497.004-.12.002-.17-.04-.204-.156-.116-.385-.247-.766-.365-1.147-.032-.11-.074-.153-.193-.153-1.066.006-2.132.006-3.2 0-.1 0-.142.03-.173.13-.127.405-.26.81-.39 1.21-.02.076-.05.117-.136.117-.874-.006-1.75-.004-2.624-.004-.016 0-.036-.005-.07-.012.023-.06.04-.116.064-.17 1.286-3.307 3.91-10.086 3.91-10.086H9.33zm-.023 6.674c-.343-1.147-.68-2.274-1.02-3.4h-.03l-1.017 3.4h2.067z\" fill=\"#fff\"\/><\/svg><\/span><\/a><a target=\"_blank\" aria-label=\"Facebook Messenger\" class=\"heateor_sss_button_facebook_messenger\" href=\"https:\/\/www.facebook.com\/dialog\/send?app_id=1904103319867886&display=popup&link=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F&redirect_uri=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_facebook_messenger\" style=\"background-color:#0084ff;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-2 -2 36 36\"><path fill=\"#fff\" d=\"M16 5C9.986 5 5.11 9.56 5.11 15.182c0 3.2 1.58 6.054 4.046 7.92V27l3.716-2.06c.99.276 2.04.425 3.128.425 6.014 0 10.89-4.56 10.89-10.183S22.013 5 16 5zm1.147 13.655L14.33 15.73l-5.423 3 5.946-6.31 2.816 2.925 5.42-3-5.946 6.31z\"\/><\/svg><\/span><\/a><a aria-label=\"Tumblr\" class=\"heateor_sss_button_tumblr\" href=\"https:\/\/www.tumblr.com\/widgets\/share\/tool?posttype=link&canonicalUrl=https%3A%2F%2Fzobi.alcowep.com%2Fbourtagshdrevxnls658739%2Fnasa-stennis-continues-preparations-for-future-artemis-testing%2F&title=NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing&caption=\" title=\"Tumblr\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg aheateor_sss_s__default heateor_sss_s_tumblr\" style=\"background-color:#29435d;width:35px;height:35px;border-radius:999px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;border-radius:999px;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-2 -2 36 36\"><path fill=\"#fff\" d=\"M20.775 21.962c-.37.177-1.08.33-1.61.345-1.598.043-1.907-1.122-1.92-1.968v-6.217h4.007V11.1H17.26V6.02h-2.925s-.132.044-.144.15c-.17 1.556-.895 4.287-3.923 5.378v2.578h2.02v6.522c0 2.232 1.647 5.404 5.994 5.33 1.467-.025 3.096-.64 3.456-1.17l-.96-2.846z\"\/><\/svg><\/span><\/a><a class=\"heateor_sss_more\" aria-label=\"More\" title=\"More\" rel=\"nofollow noopener\" style=\"font-size: 32px!important;border:0;box-shadow:none;display:inline-block!important;font-size:16px;padding:0 4px;vertical-align: middle;display:inline;\" href=\"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/nasa-stennis-continues-preparations-for-future-artemis-testing\/\" onclick=\"event.preventDefault()\"><span class=\"heateor_sss_svg\" style=\"background-color:#ee8e2d;width:35px;height:35px;border-radius:999px;display:inline-block!important;opacity:1;float:left;font-size:32px!important;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;display:inline;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box;\" onclick=\"heateorSssMoreSharingPopup(this, 'https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/nasa-stennis-continues-preparations-for-future-artemis-testing\/', 'NASA%20Stennis%20Continues%20Preparations%20for%20Future%20Artemis%20Testing', '' )\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"https:\/\/www.w3.org\/1999\/xlink\" viewBox=\"-.3 0 32 32\" version=\"1.1\" width=\"100%\" height=\"100%\" style=\"display:block;border-radius:999px;\" xml:space=\"preserve\"><g><path fill=\"#fff\" d=\"M18 14V8h-4v6H8v4h6v6h4v-6h6v-4h-6z\" fill-rule=\"evenodd\"><\/path><\/g><\/svg><\/span><\/a><\/div><div class=\"heateorSssClear\"><\/div><\/div><div class='heateorSssClear'><\/div>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","footnotes":""},"categories":[19],"tags":[34],"class_list":["post-9756","post","type-post","status-publish","format-standard","hentry","category-astronomy_astronomia","tag-astronomy"],"_links":{"self":[{"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/posts\/9756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/comments?post=9756"}],"version-history":[{"count":0,"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/posts\/9756\/revisions"}],"wp:attachment":[{"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/media?parent=9756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/categories?post=9756"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zobi.alcowep.com\/bourtagshdrevxnls658739\/wp-json\/wp\/v2\/tags?post=9756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}